Chiller and Pump Replacement Projects
Sector: Water Supply and Storage • Location: Alabama, United States of America
Source: Alabama Purchasing Group
CHILLER REPLACEMENTS - MECHANICAL : • Remove chilled water supply and return piping at the chiller back through isolation valves . • Load chillers onto Dothan City Schools vehicle . They will haul them off ‘ • Highlands and Slingluff : Include removal of abandoned pumps in demolition . They are located in mechanical
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Steel
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about Chiller and Pump Replacement Projects
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | CHILLER REPLACEMENTS - MECHANICAL : • Remove chilled water supply and return piping at the chiller back through isolation valves . • Load chillers onto Dothan City Schools vehicle . They will haul them off ‘ • Highlands and Slingluff : Include removal of abandoned pumps in demolition . They are located in mechanical rooms on site . • Provide and install new chilled water isolation valves . Prepare for connection to new chiller . o ( 2 ) for each chiller — new and existing chillers . ( 6 ) chillers total . ( 14 ) valves total . • ( 4 ) valves for Carver 9 chillers • ( 4 ) valves at Kelly Springs • ( 2 ) valves at Highlands • ( 4 ) valves at Slingluff • Install ( owner - provided ) automatic isolation valves for new chillers at Carver 9 only . o ( 2 ) valves at Carver 9 • Install new piping wells for new temperature and Dp sensors in existing chilled water piping . o Carver 9 has existing temp sensors to be relocated . • ( 2 ) temp sensors on CHWS and CHWR • ( 4 ) Dp sensors at each chiller ( 2 at each chiller ) o Kelly Springs • ( 4 ) Dp sensors at each chiller ( 2 at each chiller ) o Highlands • ( 4 ) Dp sensors at each chiller ( 2 at each chiller ) o Slingluff • ( 4 ) Dp sensors at each chiller ( 2 at each chiller ) • Install new chiller in the same location and remove the chiller . Include unloading and rigging for setting chiller . • Reuse existing chilled water supply and return piping with modifications to connect to new chiller . • Install new pressure and temperature gauges on piping at each chiller . • Provide insulation and aluminum jacketing on the exterior of insulated piping . • Provide new heat trace as needed for additional piping required for new chiller configuration . New heat trace tape furnished and installed by the mechanical contractor . • Chiller startup provided by Trane ... |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Steel |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
