logo

Chiller and Pump Replacement Projects

Sector: Water Supply and Storage • Location: Alabama, United States of America

Source: Alabama Purchasing Group

Tender
Closed

CHILLER REPLACEMENTS - MECHANICAL : • Remove chilled water supply and return piping at the chiller back through isolation valves . • Load chillers onto Dothan City Schools vehicle . They will haul them off ‘ • Highlands and Slingluff : Include removal of abandoned pumps in demolition . They are located in mechanical

Status
Closed
Sector
Water Supply and Storage, Metal, Steel
Location
Alabama, United States of America
Updated
3 Nov 2026
Source
Alabama Purchasing Group

ConstructChat

Ask ConstructChat about Chiller and Pump Replacement Projects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Chiller and Pump Replacement Projects” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Alabama, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

CHILLER REPLACEMENTS - MECHANICAL : • Remove chilled water supply and return piping at the chiller back through isolation valves . • Load chillers onto Dothan City Schools vehicle . They will haul them off ‘ • Highlands and Slingluff : Include removal of abandoned pumps in demolition . They are located in mechanical rooms on site . • Provide and install new chilled water isolation valves . Prepare for connection to new chiller . o ( 2 ) for each chiller — new and existing chillers . ( 6 ) chillers total . ( 14 ) valves total . • ( 4 ) valves for Carver 9 chillers • ( 4 ) valves at Kelly Springs • ( 2 ) valves at Highlands • ( 4 ) valves at Slingluff • Install ( owner - provided ) automatic isolation valves for new chillers at Carver 9 only . o ( 2 ) valves at Carver 9 • Install new piping wells for new temperature and Dp sensors in existing chilled water piping . o Carver 9 has existing temp sensors to be relocated . • ( 2 ) temp sensors on CHWS and CHWR • ( 4 ) Dp sensors at each chiller ( 2 at each chiller ) o Kelly Springs • ( 4 ) Dp sensors at each chiller ( 2 at each chiller ) o Highlands • ( 4 ) Dp sensors at each chiller ( 2 at each chiller ) o Slingluff • ( 4 ) Dp sensors at each chiller ( 2 at each chiller ) • Install new chiller in the same location and remove the chiller . Include unloading and rigging for setting chiller . • Reuse existing chilled water supply and return piping with modifications to connect to new chiller . • Install new pressure and temperature gauges on piping at each chiller . • Provide insulation and aluminum jacketing on the exterior of insulated piping . • Provide new heat trace as needed for additional piping required for new chiller configuration . New heat trace tape furnished and installed by the mechanical contractor . • Chiller startup provided by Trane ...

Location

Country

United States of America (USA)

State

Alabama

Source

Source

Alabama Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Metal, Steel

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender