logo

Chiller Replacement Roybal Campus

Sector: Water Supply and Storage • Location: Atlanta, Georgia, United States of America

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. a. P

Status
Prospective
Sector
Water Supply and Storage, Commercial, Residential
Location
Atlanta, Georgia, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Chiller Replacement Roybal Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Chiller Replacement Roybal Campus” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Atlanta, Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility. a. Provide all design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services required to modernize the B10 chilled-water plant. b. Replace four existing 1,450-ton chillers with new 1,800-ton chillers and provide associated starters, controls, piping, isolation valves, refrigerant monitoring, and appurtenances. c. Replace nine existing cooling tower cells with eight new cells; provide structural modifications, walkways, maintenance access, valves, piping, and roofing work required for the new configuration. d. Replace primary chilled-water pumps, condenser-water pumps, associated starters / VFDs, and modify chilled-water and condenser-water piping as required for the new plant arrangement. e. Perform associated medium-voltage and low-voltage electrical upgrades, BAS / controls integration, structural work, fire protection modifications, and ancillary systems work identified in Attachment A. f. Provide phased execution that preserves campus operations; no more than two chillers may be removed from service at one time.

Original sector

Construction

Location

Country

United States of America (USA)

State

Georgia

City

Atlanta

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Commercial, Residential

Article published date

2026-04-24

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender