CHP BMS Controls Optimisation
Sector: Solar • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
Carry out the CHP controls optimisation works within the existing BMS system. ● Reinstate the "Load Follow" PLC functionality to allow the CHP to modulate based on the site actual load. ● Control optimisation to balance the CHP and Solar systems ensuring priority is given to the CHP and its minimum turndown ● Energy Markets management system to improve revenue generation through smart controls and
- Status
- Closed
- Sector
- Solar, Education
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about CHP BMS Controls Optimisation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Carry out the CHP controls optimisation works within the existing BMS system. ● Reinstate the "Load Follow" PLC functionality to allow the CHP to modulate based on the site actual load. ● Control optimisation to balance the CHP and Solar systems ensuring priority is given to the CHP and its minimum turndown ● Energy Markets management system to improve revenue generation through smart controls and grid management |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Solar, Education |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Solar tenders in United Kingdom
- DC1 Solar Wall Principal Contractor
- PS26239 - RAF015/2627 - Plug-in batteries safety study
- PS26239 - RAF015/2627 - Plug-in batteries safety study
- PS26239 - RAF015/2627 - Plug-in batteries safety study
- NDSC-1635 Communal electrical and Fire safety Service and Maintenance Contract fro Newark & Sherwood District Council
- Electrical Services Framework
- UCLH-7718 Renewable Energy Power Purchase Agreement
- Power Purchase Agreements for DCC Buildings
