Chumbley & Cottonwood Island Mitigation Site Maintenance Edwosb Set-Aside Satoc
Sector: Aerospace & Defense • Location: Kelso, Washington, United States of America
Source: SAM.gov
The US Army Corps of Engineers – Portland District (USACE) is soliciting for services to maintain existing riparian plantings at the Chumbley and Cottonwood Island wildlife mitigation sites in Cowlitz County, WA. This is a non-personal services requirement. The contractor shall perform these services in accordance with the terms of the contract and as defined in this Performance Work Statement (PW
- Status
- Prospective
- Sector
- Aerospace & Defense, Commercial, Waste Processing and Treatment, Residential
- Location
- Kelso, Washington, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Chumbley & Cottonwood Island Mitigation Site Maintenance Edwosb Set-Aside Satoc
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The US Army Corps of Engineers – Portland District (USACE) is soliciting for services to maintain existing riparian plantings at the Chumbley and Cottonwood Island wildlife mitigation sites in Cowlitz County, WA. This is a non-personal services requirement. The contractor shall perform these services in accordance with the terms of the contract and as defined in this Performance Work Statement (PWS). This is a Single Award Task Order (SATOC) contract with a five-year ordering period from the date of award. For 2026, USACE has already identified the acreage requirements for the Chumbley and Cottonwood Island sites as described in the 2026 Task Order PWS. The 2026 Task Order will serve as the Seed Project and satisfy the minimum guarantee. It will be awarded in conjunction with the SATOC award. The approved environmental work window for Cottonwood Island is from 15 June to 31 October. The Contractor is not allowed to begin work before 15 June for the protection of a heron rookery. See the attached Synopsis/Solicitation and supporting documents for additional details. |
Original sector | Administrative and Support and Waste Management and Remediation Services |
Location
Country | United States of America (USA) |
State | Washington |
City | Kelso |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Commercial, Waste Processing and Treatment, Residential |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
