Cilley Hill Dam Removal Study and Preliminary Design , Jericho , Vermont
Bids closed Mar 2026 · Vermont · Last reported Jan 2026
Source: Vermont Purchasing Group
The purpose of this study is to determine the logistics , obstacles , costs , benefits , and disadvantages of removing the Cilley Hill Dam in Jericho , Vermont . With the exception of historic resource considerations , which will be dealt with in a separate study , this purpose can be accomplished through the fol
- Status
- Closed
- Sector
- Hydro, Warehouse
- Location
- Vermont, United States of America
- Updated
- 3 Nov 2026
- Source
- Vermont Purchasing Group
ConstructChat
Ask ConstructChat about Cilley Hill Dam Removal Study and Preliminary Design , Jericho , Vermont
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The purpose of this study is to determine the logistics , obstacles , costs , benefits , and disadvantages of removing the Cilley Hill Dam in Jericho , Vermont . With the exception of historic resource considerations , which will be dealt with in a separate study , this purpose can be accomplished through the following tasks . Task 1 : Data Collection The first task includes a desktop survey of existing data ( dam inspections , existing plans , flood damage information , available GIS mapping ), a field survey of the site and conditions , the mapping of invasive species at the site , an assessment of habitats present at the site ( ex . wetlands ), probing / sampling / testing of impounded sediments for contaminants ( metals , PAHs , and organic contaminants ), an estimate of impounded sediment volume , stream geomorphic assessment , structural / geotechnical / utilities assessments , and photo - rendering of post - dam removal conditions . Winooski NRCD and VNRC will coordinate with landowners to provide access to the site . Task 2 : Hydrology Calculations and Hydraulic Modeling The second task includes the estimation of river flows , river analysis ( RAS ) model setup , and RAS model validation . These models must show the hydrological impacts of the dam removal both up and downstream of the dam . The models must provide an assessment of how much river elevation will be lowered following the removal of the dam . The engineer will also conduct an inundation analysis using these models . |
Location
Country | United States of America (USA) |
State | Vermont |
Source
Source | Vermont Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Hydro, Warehouse |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
