logo

Cilley Hill Dam Removal Study and Preliminary Design , Jericho , Vermont

Bids closed Mar 2026 · Vermont · Last reported Jan 2026

Source: Vermont Purchasing Group

Tender
Closed

The purpose of this study is to determine the logistics , obstacles , costs , benefits , and disadvantages of removing the Cilley Hill Dam in Jericho , Vermont . With the exception of historic resource considerations , which will be dealt with in a separate study , this purpose can be accomplished through the fol

Status
Closed
Sector
Hydro, Warehouse
Location
Vermont, United States of America
Updated
3 Nov 2026
Source
Vermont Purchasing Group

ConstructChat

Ask ConstructChat about Cilley Hill Dam Removal Study and Preliminary Design , Jericho , Vermont

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Cilley Hill Dam Removal Study and Preliminary Design , Jericho , Vermont” is a tender record in Taiyo, linked to the Hydro sector. It is issued for works, goods, or services related to Vermont, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The purpose of this study is to determine the logistics , obstacles , costs , benefits , and disadvantages of removing the Cilley Hill Dam in Jericho , Vermont . With the exception of historic resource considerations , which will be dealt with in a separate study , this purpose can be accomplished through the following tasks . Task 1 : Data Collection The first task includes a desktop survey of existing data ( dam inspections , existing plans , flood damage information , available GIS mapping ), a field survey of the site and conditions , the mapping of invasive species at the site , an assessment of habitats present at the site ( ex . wetlands ), probing / sampling / testing of impounded sediments for contaminants ( metals , PAHs , and organic contaminants ), an estimate of impounded sediment volume , stream geomorphic assessment , structural / geotechnical / utilities assessments , and photo - rendering of post - dam removal conditions . Winooski NRCD and VNRC will coordinate with landowners to provide access to the site . Task 2 : Hydrology Calculations and Hydraulic Modeling The second task includes the estimation of river flows , river analysis ( RAS ) model setup , and RAS model validation . These models must show the hydrological impacts of the dam removal both up and downstream of the dam . The models must provide an assessment of how much river elevation will be lowered following the removal of the dam . The engineer will also conduct an inundation analysis using these models .

Location

Country

United States of America (USA)

State

Vermont

Source

Source

Vermont Purchasing Group

URL

More Details

Record type

Tender

Sector

Hydro, Warehouse

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender