logo

City of White Salmon Fuels Mitigation – Phase 2

Bids closed Apr 2026 · Washington · Last reported Mar 2026

Source: Washington Purchasing Group

Tender
Closed

The Washington State Department of Natural Resources , hereafter called “ DNR ” or the “ Agency ”, is initiating this solicitation to solicit proposals from firms to conduct fuels mitigation work on approximately 116 . 9 acres of privately owned forest land surrounding the City of White Salmon , WA . This work will

Status
Closed
Sector
Manufacturing (Industrial), Road, Hospital
Location
Washington, United States of America
Updated
3 Nov 2026
Source
Washington Purchasing Group

ConstructChat

Ask ConstructChat about City of White Salmon Fuels Mitigation – Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “City of White Salmon Fuels Mitigation – Phase 2” is a tender record in Taiyo, linked to the Manufacturing (Industrial) sector. It is issued for works, goods, or services related to Washington, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Washington State Department of Natural Resources , hereafter called “ DNR ” or the “ Agency ”, is initiating this solicitation to solicit proposals from firms to conduct fuels mitigation work on approximately 116 . 9 acres of privately owned forest land surrounding the City of White Salmon , WA . This work will provide beneficial hazardous fuels reduction work to the City of White Salmon , Washington . The project will work to mitigate fuel loads to the north , east , and west of town to create a 75 - 150 - foot shaded fuel break , depending on location , between alternate highway 141 and other untreated areas and the town . The work will provide much needed protection to critical infrastructure within the town such as the hospital and multiple schools . This is accomplished through thinning , pruning , brush treatments , and slash treatments . The desired outcome of this project is to reduce the risk of catastrophic wildfire across private and public lands , increase firefighter safety , and to enhance forest health by thinning dense , over stocked , diseased stands leaving a more resilient residual forest stand . SCOPE The intent of this RFQQ is to procure hazardous fuels reduction services under one contract to reduce the risk of catastrophic wildfire on approximately 116 . 9 acres of private forested lands along Cox Road and behind the high school to the north of town , and along the bluff to the west of town . The number of acres in this RFQQ may be reduced as agreed by both parties if a safety issue arises within the site . The project is located in Klickitat County , Washington . Due to differences in terrain and treatment needs , the project area is split into multiple units . The location of each unit can be found in the unit description below . Maps of the general vicinity and specific project area are attached as Exhibit F . Unit 1 – Sterling Estates and Brislawn – will run north behind the homes of Sterling Estates and Brislawn Firewise communities on the west side of White Salmon . Work will consist of hand thinning , brush removal , pruning , and chipping of slash . Unit 1 is located in T3N R10E S14 & 23 . Unit 2 – Highway 141 and 141 ALT – is directly north of Unit 1 in T3N R10E S14 . Work will consist mainly of hand thinning , brush removal , hand pruning , and chipping of slash with some areas eligible for use of small machinery . Some slash may be dragged down to Highway 141A to chip and disperse from the road . Unit 3 – Cox Road and White Salmon Schools – is located to the north of town in T3N R10E S12 , 13 , & T3N R11E S18 . Work will consist of hand thinning , pruning , brush removal , and chipping of slash . Some areas may be eligible for use of small equipment . This will be up to the discretion of the successful contractor and contract manager . Unit 4 – Skyline Hospital – is located to the east of town in T3N R11E S30 . Work will consist of hand thinning , pruning , brush removal . And chipping of slash . Areas located away from the hospital may be eligible for use of small equipment . The successful contractor will provide supervision , labor , transportation , materials , equipment , and associated expenses for this fuels mitigation project , while meeting all industrial fire precaution level restrictions . Hand crews will consist of an experienced foreman , laborers , a chipper , transportation , and all necessary equipment , tools , and supplies . Mechanical crews will consist of mastication machines with an experienced operator , transportation , and all necessary equipment , tools , and supplies to perform the tasks , as well as the ability to prune to the required standards in the treatment specifications . Pruning with mastication machine will not be allowed . General Prescription / Specifications : Treatment Area Boundaries : Treatment units are bound by pink flagging . Treatment Unit end points are identified by pink and blue flagging . Areas and vegetation marked with candy stripe ( red and white ) flagging are DO NOT CUT areas . Trees marked with blue flagging are DO NOT CUT trees .

Location

Country

United States of America (USA)

State

Washington

Source

Source

Washington Purchasing Group

URL

More Details

Record type

Tender

Sector

Manufacturing (Industrial), Road, Hospital

Article published date

2026-05-14

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender