City of White Salmon Fuels Mitigation – Phase 2
Bids closed Apr 2026 · Washington · Last reported Mar 2026
Source: Washington Purchasing Group
The Washington State Department of Natural Resources , hereafter called “ DNR ” or the “ Agency ”, is initiating this solicitation to solicit proposals from firms to conduct fuels mitigation work on approximately 116 . 9 acres of privately owned forest land surrounding the City of White Salmon , WA . This work will
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Hospital
- Location
- Washington, United States of America
- Updated
- 3 Nov 2026
- Source
- Washington Purchasing Group
ConstructChat
Ask ConstructChat about City of White Salmon Fuels Mitigation – Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Washington State Department of Natural Resources , hereafter called “ DNR ” or the “ Agency ”, is initiating this solicitation to solicit proposals from firms to conduct fuels mitigation work on approximately 116 . 9 acres of privately owned forest land surrounding the City of White Salmon , WA . This work will provide beneficial hazardous fuels reduction work to the City of White Salmon , Washington . The project will work to mitigate fuel loads to the north , east , and west of town to create a 75 - 150 - foot shaded fuel break , depending on location , between alternate highway 141 and other untreated areas and the town . The work will provide much needed protection to critical infrastructure within the town such as the hospital and multiple schools . This is accomplished through thinning , pruning , brush treatments , and slash treatments . The desired outcome of this project is to reduce the risk of catastrophic wildfire across private and public lands , increase firefighter safety , and to enhance forest health by thinning dense , over stocked , diseased stands leaving a more resilient residual forest stand . SCOPE The intent of this RFQQ is to procure hazardous fuels reduction services under one contract to reduce the risk of catastrophic wildfire on approximately 116 . 9 acres of private forested lands along Cox Road and behind the high school to the north of town , and along the bluff to the west of town . The number of acres in this RFQQ may be reduced as agreed by both parties if a safety issue arises within the site . The project is located in Klickitat County , Washington . Due to differences in terrain and treatment needs , the project area is split into multiple units . The location of each unit can be found in the unit description below . Maps of the general vicinity and specific project area are attached as Exhibit F . Unit 1 – Sterling Estates and Brislawn – will run north behind the homes of Sterling Estates and Brislawn Firewise communities on the west side of White Salmon . Work will consist of hand thinning , brush removal , pruning , and chipping of slash . Unit 1 is located in T3N R10E S14 & 23 . Unit 2 – Highway 141 and 141 ALT – is directly north of Unit 1 in T3N R10E S14 . Work will consist mainly of hand thinning , brush removal , hand pruning , and chipping of slash with some areas eligible for use of small machinery . Some slash may be dragged down to Highway 141A to chip and disperse from the road . Unit 3 – Cox Road and White Salmon Schools – is located to the north of town in T3N R10E S12 , 13 , & T3N R11E S18 . Work will consist of hand thinning , pruning , brush removal , and chipping of slash . Some areas may be eligible for use of small equipment . This will be up to the discretion of the successful contractor and contract manager . Unit 4 – Skyline Hospital – is located to the east of town in T3N R11E S30 . Work will consist of hand thinning , pruning , brush removal . And chipping of slash . Areas located away from the hospital may be eligible for use of small equipment . The successful contractor will provide supervision , labor , transportation , materials , equipment , and associated expenses for this fuels mitigation project , while meeting all industrial fire precaution level restrictions . Hand crews will consist of an experienced foreman , laborers , a chipper , transportation , and all necessary equipment , tools , and supplies . Mechanical crews will consist of mastication machines with an experienced operator , transportation , and all necessary equipment , tools , and supplies to perform the tasks , as well as the ability to prune to the required standards in the treatment specifications . Pruning with mastication machine will not be allowed . General Prescription / Specifications : Treatment Area Boundaries : Treatment units are bound by pink flagging . Treatment Unit end points are identified by pink and blue flagging . Areas and vegetation marked with candy stripe ( red and white ) flagging are DO NOT CUT areas . Trees marked with blue flagging are DO NOT CUT trees . |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Washington Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Manufacturing (Industrial), Road, Hospital |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
