logo

City of Winder Energy Savings Performance Contracting ( ESPC )

Sector: Commercial • Location: Georgia, United States of America

Source: Georgia Purchasing Group

Tender
Closed

1 . Scope of Services ( Technical Requirements ) The Scope of Services must be included in any performance contract the City enters into , and must include the following items at a minimum : a . Investment Grade Technical Energy Audit and Report . The ESCO ' s proposed contract terms must include the performance

Status
Closed
Sector
Commercial, Residential
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about City of Winder Energy Savings Performance Contracting ( ESPC )

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “City of Winder Energy Savings Performance Contracting ( ESPC )” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . Scope of Services ( Technical Requirements ) The Scope of Services must be included in any performance contract the City enters into , and must include the following items at a minimum : a . Investment Grade Technical Energy Audit and Report . The ESCO ' s proposed contract terms must include the performance and presentation of results from a detailed investment grade technical energy audit and report of acceptable quality to the City . If the City decides not to enter into a contract after the audit report has been accepted , the City agrees to pay the cost of the audit as stated in the submitted response to this RFQ , provided that all contract terms and conditions of the audit have been met by the ESCO . b . Standards of Comfort . Specific standards of comfort , safety and functionality will not be degraded from the existing condition and / or shall meet minimum established industry standards . The ESCO will be responsible for maintaining the levels of comfort for each building as specified in the Technical Facility Profile or in any final agreement . Persistent failure to maintain the defined climate and lighting conditions will constitute a default . c . Professional Engineer Involvement . A registered professional engineer must , at a minimum , review and approve design work done under this contract . d . Guaranteed Savings . The City requires a minimum annual savings guarantee . If the project does not generate the guaranteed level of savings in any given year , the ESCO will be responsible for reimbursing the City the amount of necessary to pay for annual project and all related contract obligations . Excess savings will not be used to reimburse the ESCO for any payments made due to shortfalls in other years or be credited to future annual savings guarantees . e . Construction Management . The ESCO will be required to work with current building management and maintenance personnel to coordinate construction and provide appropriate training in operations and maintenance of all installed improvements . No equipment or other improvements will be installed that would require the City to hire additional personnel unless contract negotiations produce an explicit exemption for a specific installation . h . Equipment Standardization . All equipment installed that is comparable to similar equipment at other sites operated by the City shall be of the same manufacturer for standardization of equipment agency wide , unless otherwise accepted by the City . i . As - Built Drawings . Where applicable , ESCO must provide by mylar , reproducible " as built " and record drawings ( or such electronic equivalents as may be agreed to with the City ) of all existing and modified conditions associated with the project , conforming to typical engineering standards . These should include architectural , mechanical , electrical , structural , and control drawings and operating manuals within 30 days of completion of installation .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Commercial, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender