Climate Resilience Multi-Phase Programmatic Approach: Construction of 50m long retaining wall (Left side) chainage at 0+500 Masmulla ara canal in Hamaragoda scheme
Sector: Water Supply and Storage • Location: Sri Lanka
Source: DevelopmentAid
Climate Resilience Multi-Phase Programmatic Approach: Construction of 50m long retaining wall (Left side) chainage at 0+500 Masmulla ara canal in Hamaragoda scheme
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials
- Location
- Sri Lanka
- Updated
- 3 Nov 2026
- Source
- DevelopmentAid
ConstructChat
Ask ConstructChat about Climate Resilience Multi-Phase Programmatic Approach: Construction of 50m long retaining wall (Left side) chainage at 0+500 Masmulla ara canal in Hamaragoda scheme
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Climate Resilience Multi-Phase Programmatic Approach: Construction of 50m long retaining wall (Left side) chainage at 0+500 Masmulla ara canal in Hamaragoda scheme |
Location
Country | Sri Lanka |
Source
Source | DevelopmentAid |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Raw Materials |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
