logo

Closed Circuit Wind Tunnel

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Solicitation

Purchase Description Procurement of Closed-Circuit Wind Tunnel Requirements: • This wind tunnel must be a closed circuit, as the operation of an LDV system requires seed particles to be added to the air stream – in this case, a substance called Bis(2-ethylhexyl) subacute. The wind tunnel thus needs to be fitted with a 3/8-inch Swagelok bulkhead fitting placed upstream of the test and transitional

Status
Prospective
Sector
Power Generation (CCGT), Aerospace & Defense, Wind, Seaport, Commercial, Tunnel, Broadband, Telecommunications, Residential
Location
Redstone Arsenal, Alabama, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Closed Circuit Wind Tunnel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Closed Circuit Wind Tunnel” is a tender record in Taiyo, linked to the Power Generation (CCGT) sector. It is issued for works, goods, or services related to Redstone Arsenal, Alabama, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Purchase Description Procurement of Closed-Circuit Wind Tunnel Requirements: • This wind tunnel must be a closed circuit, as the operation of an LDV system requires seed particles to be added to the air stream – in this case, a substance called Bis(2-ethylhexyl) subacute. The wind tunnel thus needs to be fitted with a 3/8-inch Swagelok bulkhead fitting placed upstream of the test and transitional sections. • This wind tunnel must have a maximum operating speed of approximately 50 meters per second (~9900 feet per minute). The test section walls must have 6.85 millimeter (0.27-inch)-thick grooves placed at approximately 75 percent of the total length of the test section as measured from the entrance in which specialized nozzle restriction plates can be affixed to adjust the operating range and achieve an air speed of 0.15 meters per second (~30 feet per minute). The typical turbulence intensity across this operating range must be less than 1 percent, where turbulence intensity is defined as the root-mean-square of velocity fluctuations divided by the average test section velocity. • This wind tunnel must have a test section size of 101.6 millimeters by 101.6 millimeters (~4 inches by 4 inches). Test section length can vary if the design meets the following requirements: The test section must have at least two sealable ports or fittings for the insertion of instruments of various sizes, such as Pitot-static tubes and hotwire anemometers. These ports or fittings must accommodate the following instrument diameters: 4.3 mm (~0.188 in); 6.3 mm (0.25 in); 7.9 mm (0.313 in); 9.5 mm (0.375 in); 10.1 mm (0.4 in); 12.7 mm (0.5 in); 15.9 mm (0.625 in). One port must be located 49.5 mm (1.95 in) from the inlet, centered into the test section; the other port should be offset from this port by 37.5 mm (1.47 in). Additionally, the test section sidewalls must be made of optical-quality glass to minimize interference with laser propagation. The argon-ion continuous-wave laser used in this application has a max wavelength of 532 nanometers and 500 milliwatts output power. • The wind tunnel must have a centrifugal fan design. The fan should be isolated from the rest of the tunnel system to minimize vibration. The fan must be controlled by a variable-frequency drive (VFD) connected to a motor of appropriate size and power to meet the air speed requirements listed above. The VFD must be implemented such that an operator could use computer software or manual input to control the drive and automate its function. The computer-VFD interface must not rely on internet or wireless connections, such as Bluetooth or WiFi. This interface must be programmable via National Instruments’ LabVIEW software. • Any design submitted must be shown to meet the specific air speed and turbulence requirements listed above through a quantitative analysis, such as by computational fluid dynamics (CFD) simulations or other appropriate methods. 1.0 Delivery Requirements Shipping Address: U.S. Army TMDE Activity, Attn: Michael Tyler, Building 5435, Redstone Arsenal, AL 35898

Original sector

Professional, Scientific, and Technical Services

Location

Country

United States of America (USA)

State

Alabama

City

Redstone Arsenal

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Power Generation (CCGT), Aerospace & Defense, Wind, Seaport, Commercial, Tunnel, Broadband, Telecommunications, Residential

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender