logo

Clovis East PA System Replacement

Sector: Commercial • Location: California, United States of America

Source: California Purchasing Group

Tender
Closed

Notice is hereby given that CLOVIS UNIFIED SCHOOL DISTRICT , ( hereinafter referred to as " Owner ") will receive sealed bids prior to the date and time stated for the Bid Opening for construction of : BID 3072 – Clovis East PA System Replacement PART 1 – GENERAL 1 . 01 RELATED DOCUMENTS A . Contract General C

Status
Closed
Sector
Commercial
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Clovis East PA System Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Clovis East PA System Replacement” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Notice is hereby given that CLOVIS UNIFIED SCHOOL DISTRICT , ( hereinafter referred to as " Owner ") will receive sealed bids prior to the date and time stated for the Bid Opening for construction of : BID 3072 – Clovis East PA System Replacement PART 1 – GENERAL 1 . 01 RELATED DOCUMENTS A . Contract General Conditions . B . Specification Divisions 16 and 17 . 1 . 02 SUMMARY A . This Section specifies administrative and procedural requirements for project close out , including but not limited to : 1 . Final inspection procedures . 2 . Operating and maintenance manual submittal . 3 . Spare parts / materials . 4 . Submittal of warranties . 5 . Training . 6 . As - built drawings . 7 . As - built schedule . 8 . State Fire Marshal inspection . 9 . Other regulatory inspection . 10 . Removal of temporary facilities . 11 . Final cleaning . 12 . Commissioning / equipment startup . 1 . 03 PUNCH - LIST INSPECTION A . When each building / phase is in the opinion of the Contractor , complete in all respects , the Contractor shall call for a punch - list inspection . B . Inspection Procedures : On receipt of a request for inspection , the Engineer will schedule the Inspection . The Engineer will then perform a preliminary , sufficiency walk - through . If , in the judgment of the Engineer , the project is not complete in all respects , the Engineer will so advise the Contractor and discontinue the inspection . 1 . The Engineer will repeat inspection when requested and assured that the work has been completed . 2 . Results of the completed inspection will form the basis of requirements for final acceptance punch - list . 1 . 04 RECORD DOCUMENT SUBMITTALS A . General : Do not use record documents for construction purposes ; protect from deterioration and loss in a secure , fire - resistive location ; provide access to record documents for The Districts ’ and the Engineer ’ s reference during normal working hours .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Commercial

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender