CMAR for Kortsen Road from Pinal Ave to Peart Rd
The scope, dates and status of this tender. A free account opens every field.
Source: Arizona Purchasing Group
A . During the pre - construction phase services by the CMAR may , at a minimum , be required to : 1 . Work with the design team in the development of final design plans and quantities , including providing suggestions or recommendations for value engineering and other potential cost - savings opportunities . 2 . Dev
- Status
- Closed
- Sector
- Road, Power Transmission, Power Generation (CCGT)
- Location
- Arizona, United States of America
- Updated
- 3 Nov 2026
- Source
- Arizona Purchasing Group
ConstructChat
Ask ConstructChat about CMAR for Kortsen Road from Pinal Ave to Peart Rd
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A . During the pre - construction phase services by the CMAR may , at a minimum , be required to : 1 . Work with the design team in the development of final design plans and quantities , including providing suggestions or recommendations for value engineering and other potential cost - savings opportunities . 2 . Develop a Guaranteed Maximum Price ( GMP ) to perform the work identified in the plans developed by the Project design team . 3 . Identify any long - lead items required . 4 . Provide a conceptual schedule for the Project , primarily the construction phase . B . During the Construction phase services by the CMAR may , at a minimum be required to : 1 . Construct all improvements . 2 . Coordinate with various City of Casa Grande departments , other agencies , utility companies , etc . 3 . Arrange for procurement of materials and equipment . 4 . Maintain the approved Project schedule . 5 . Bid , award , and manage all construction - related contracts while meeting City requirements for procurement of subcontractor and supplier bids . 6 . Provide quality controls , including QA / QC testing . 7 . Provide payment and performance bonds to ensure construction . 8 . Address and obtain federal , state , and local permitting requirements . 9 . Assist in the resolution of owner issues . 10 . Maintain a safe work site for all Project participants ... |
Location
Country | United States of America (USA) |
State | Arizona |
Source
Source | Arizona Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
