CNG BUS FIRE SUPPRESSION SYSTEM INSPECTION
Sector: Mass Transit • Location: Nebraska, United States of America
Source: Nebraska Purchasing Group
In general , the Metro is requesting proposals from qualified certified companies to perform the annual maintenance of Amerex Suppression Fire System in Metro ’ s CNG fleet . This accounts for the inspection of a total of 50 New Flyer bus Amerex fire suppression systems . The vehicles must be in service at
- Status
- Closed
- Sector
- Mass Transit, Automotive, Fertilizers
- Location
- Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- Nebraska Purchasing Group
ConstructChat
Ask ConstructChat about CNG BUS FIRE SUPPRESSION SYSTEM INSPECTION
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | In general , the Metro is requesting proposals from qualified certified companies to perform the annual maintenance of Amerex Suppression Fire System in Metro ’ s CNG fleet . This accounts for the inspection of a total of 50 New Flyer bus Amerex fire suppression systems . The vehicles must be in service at time of inspection to qualify for work ; vehicles not in service at time of inspection will not be included in the inspection cycle . Manufacturer # of vehicles ; New Flyer 50 ; The Regional Metropolitan Transit Authority of Omaha acquires supplemental services from outside vendors to maintain an acceptable equipment quality . This includes , but is not limited to , the inspection of our vehicle CNG Amerex suppression systems . Project Specifications : a . Technicians need to be certified to complete the inspections . b . Verify that hazards have not changed . Look for changes in vehicle operation or cleaning procedures that may have increased the hazard . Compare with the original vehicle hazard analysis . c . Examine and test all heat detection devices per guidelines in the latest version of applicable Amerex Installation , Operation and Maintenance Manual found at the Amerex website ( www . amerex - fire . com ). d . Inspect the Agent Cylinder ( s ) and Nitrogen Cylinder ( s ) on systems so equipped . If Pressure Gauge is bent or damaged , depressurize Cylinder ( s ) and replace . Clean Cylinder ( s ) to remove dirt , grease and foreign material . Make sure that instruction nameplates are securely fastened and legible . Inspect the Cylinder ( s ) for corrosion , abrasion , and dents or damage . Replace Nitrogen Cylinder ( s ) with new ones and hydrotest Agent Cylinder ( s ) if any of these conditions are found . If Agent Cylinder ( s ) are found to be faulty , replace . e . Remove and inspect control heads for damaged , missing , or substituted parts . Instructions for control head disassembly , cleaning and reassembly can be found in Chapter 6 . f . Inspect and clean the top of the Agent Cylinder Valve . g . Disconnect Discharge Fitting Kit or Agent Distribution Network ( V150 / V250 only ) from Agent Cylinder Valve ( make sure that actuation method ( s ) are removed or disabled when performing this step !). Inspect Agent Cylinder Valve discharge port for contaminants and clean if necessary . h . Examine the Agent Distribution Network . Look for signs of wear or chafing on network hoses . Replace any damaged hose sections . • Examine Nozzles and protective Dust Caps . If protective Dust Caps are missing from Nozzles , re - install new ones . i . Purge the Agent Distribution Network with air or nitrogen only . j . If a Pneumatic Actuation Network is used , unscrew Nitrogen Cylinders from actuators . Cycle each actuator several times verifying free travel of Puncture Stem Assembly inside of each actuator . If any defects are found , rebuild actuator . k . Verify that the Pneumatic Actuation Network is functioning properly by performing the Pneumatic Actuation Network Testing . l . Document all work completed during service for record retention . Disclose any anomalies , deficiencies to the property owner for corrective action requirements . |
Location
Country | United States of America (USA) |
State | Nebraska |
Source
Source | Nebraska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Mass Transit, Automotive, Fertilizers |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Mass Transit tenders in United States of America
- Regional Parks Fire Fuel Reduction Work
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- RFQ for Biosolids Digester Facilities - Southeast Treatment ...
- Request/Notice for Qualifications for Biosolids Digester Fac...
- REJECTED: Bay Corridor Transmission and Distribution - Phase...
- Mission Street, 16th to Cesar Chavez, Brick Sewer Rehabilita...
- Green Infrastructure (Bio Retention) on The Van Ness Improve...
- 8-Inch DIP and 12-Inch ERDIP Water Main Installation on 22nd...
