logo

CNG BUS FIRE SUPPRESSION SYSTEM INSPECTION

Sector: Mass Transit • Location: Nebraska, United States of America

Source: Nebraska Purchasing Group

Tender
Closed

In general , the Metro is requesting proposals from qualified certified companies to perform the annual maintenance of Amerex Suppression Fire System in Metro ’ s CNG fleet . This accounts for the inspection of a total of 50 New Flyer bus Amerex fire suppression systems . The vehicles must be in service at

Status
Closed
Sector
Mass Transit, Automotive, Fertilizers
Location
Nebraska, United States of America
Updated
3 Nov 2026
Source
Nebraska Purchasing Group

ConstructChat

Ask ConstructChat about CNG BUS FIRE SUPPRESSION SYSTEM INSPECTION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “CNG BUS FIRE SUPPRESSION SYSTEM INSPECTION” is a tender record in Taiyo, linked to the Mass Transit sector. It is issued for works, goods, or services related to Nebraska, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

In general , the Metro is requesting proposals from qualified certified companies to perform the annual maintenance of Amerex Suppression Fire System in Metro ’ s CNG fleet . This accounts for the inspection of a total of 50 New Flyer bus Amerex fire suppression systems . The vehicles must be in service at time of inspection to qualify for work ; vehicles not in service at time of inspection will not be included in the inspection cycle . Manufacturer # of vehicles ; New Flyer 50 ; The Regional Metropolitan Transit Authority of Omaha acquires supplemental services from outside vendors to maintain an acceptable equipment quality . This includes , but is not limited to , the inspection of our vehicle CNG Amerex suppression systems . Project Specifications : a . Technicians need to be certified to complete the inspections . b . Verify that hazards have not changed . Look for changes in vehicle operation or cleaning procedures that may have increased the hazard . Compare with the original vehicle hazard analysis . c . Examine and test all heat detection devices per guidelines in the latest version of applicable Amerex Installation , Operation and Maintenance Manual found at the Amerex website ( www . amerex - fire . com ). d . Inspect the Agent Cylinder ( s ) and Nitrogen Cylinder ( s ) on systems so equipped . If Pressure Gauge is bent or damaged , depressurize Cylinder ( s ) and replace . Clean Cylinder ( s ) to remove dirt , grease and foreign material . Make sure that instruction nameplates are securely fastened and legible . Inspect the Cylinder ( s ) for corrosion , abrasion , and dents or damage . Replace Nitrogen Cylinder ( s ) with new ones and hydrotest Agent Cylinder ( s ) if any of these conditions are found . If Agent Cylinder ( s ) are found to be faulty , replace . e . Remove and inspect control heads for damaged , missing , or substituted parts . Instructions for control head disassembly , cleaning and reassembly can be found in Chapter 6 . f . Inspect and clean the top of the Agent Cylinder Valve . g . Disconnect Discharge Fitting Kit or Agent Distribution Network ( V150 / V250 only ) from Agent Cylinder Valve ( make sure that actuation method ( s ) are removed or disabled when performing this step !). Inspect Agent Cylinder Valve discharge port for contaminants and clean if necessary . h . Examine the Agent Distribution Network . Look for signs of wear or chafing on network hoses . Replace any damaged hose sections . • Examine Nozzles and protective Dust Caps . If protective Dust Caps are missing from Nozzles , re - install new ones . i . Purge the Agent Distribution Network with air or nitrogen only . j . If a Pneumatic Actuation Network is used , unscrew Nitrogen Cylinders from actuators . Cycle each actuator several times verifying free travel of Puncture Stem Assembly inside of each actuator . If any defects are found , rebuild actuator . k . Verify that the Pneumatic Actuation Network is functioning properly by performing the Pneumatic Actuation Network Testing . l . Document all work completed during service for record retention . Disclose any anomalies , deficiencies to the property owner for corrective action requirements .

Location

Country

United States of America (USA)

State

Nebraska

Source

Source

Nebraska Purchasing Group

URL

More Details

Record type

Tender

Sector

Mass Transit, Automotive, Fertilizers

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender