The project includes complete removal of 154 , 731 sq ft of all above - grade and below - grade structures and appurtenances , except for the existing building pad , which shall remain intact . 2 . 0 General Demolition Requirements The Contractor shall furnish all labor , materials , equipment , supervision , permits , and

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Commercial, Power Transmission, Power Generation (CCGT)
Location
Alabama, United States of America
Updated
3 Nov 2026
Source
Alabama Purchasing Group

ConstructChat

Ask ConstructChat about CNG STATION SITE DEMOLITION & ABATEMENT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “CNG STATION SITE DEMOLITION & ABATEMENT” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Alabama, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The project includes complete removal of 154 , 731 sq ft of all above - grade and below - grade structures and appurtenances , except for the existing building pad , which shall remain intact . 2 . 0 General Demolition Requirements The Contractor shall furnish all labor , materials , equipment , supervision , permits , and incidentals necessary to perform the work , including but not limited to : • Demolition of all existing buildings and structures within the defined project limits • Removal of structural components including : o Roof systems o Exterior and interior walls o Floors ( excluding building pad ) o Canopies , awnings , and overhangs • Demolition of all mechanical , electrical , and plumbing systems serving the structures • Removal of debris and disposal at licensed facilities • Removal of Times Square Sign in its entirety 3 . 0 Hazardous Materials Abatement Where identified in the contract documents : • Perform abatement of asbestos - containing materials ( ACM ), lead - based paint , and other regulated materials in accordance with : o EPA regulations o OSHA standards o Alabama Department of Environmental Management ( ADEM ) requirements • Provide proper notifications , air monitoring , clearance testing , and disposal documentation • Abatement shall be completed prior to structural demolition , unless otherwise permitted by regulation 4 . 0 Site Utilities & Disconnections The Contractor shall : • Coordinate with utility providers to locate , disconnect , cap , and secure all utilities , including : o Electrical o Gas o Water o Sewer o Communications • Protect any utilities designated to remain in service • Provide verification of disconnections prior to demolition 5 . 0 Below - Grade Work • Remove foundations , footings , and underground structures to the extent indicated in the drawings • Demolish slabs , curbs , and pavements as shown • Building pad shall not be demolished or disturbed • Backfill voids with approved material and compact to specified density 6 . 0 Environmental & Safety Controls The Contractor shall implement and maintain : • Dust control measures • Erosion and sediment control • Noise mitigation • Site security and fencing • OSHA - compliant safety plans • Traffic control as required 7 . 0 Salvage & Recycling • Salvage or recycle materials where feasible in accordance with project requirements • Remove and legally dispose of all non - salvageable materials • No on - site burial of debris is permitted 8 . 0 Site Restoration Upon completion of demolition : • Grade the site to promote positive drainage • Remove temporary facilities and controls • Leave the site in a clean , stable , and safe condition • The building pad shall be left undamaged and ready for future development 9 . 0 Schedule & Coordination • Contractor shall complete work within the contract time specified as 90 Calendar Days . • Coordinate work with BJCTA representatives • Provide a demolition schedule prior to commencement 10 . 0 Drawings & Specifications All work shall be performed in accordance with : • This Scope of Work • Technical specifications • Demolition drawings • Environmental reports ( if applicable ) In the event of a conflict , the more stringent requirement shall govern . 11 . 0 Exclusions ( Very Important ) The following items are explicitly excluded unless otherwise noted : • Demolition or removal of the existing building pad • New construction • Utility upgrades beyond disconnection and capping

Location

Country

United States of America (USA)

State

Alabama

Source

Source

Alabama Purchasing Group

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Water Supply and Storage, Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender