CO Lab HVAC / Mechanical Renovation Project
Closed · Missouri · Last reported Feb 2026
Source: Missouri Purchasing Group
4 . 1 . Scope of Work Phase 1 a . Location : This phase consists of the majority of the basement area . b . The scope of work for this phase includes the following : 1 ) Demolition of existing steam boilers , steam humidification system , and heating hot water system . 2 ) Demolition of existing steam , condensate
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about CO Lab HVAC / Mechanical Renovation Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 4 . 1 . Scope of Work Phase 1 a . Location : This phase consists of the majority of the basement area . b . The scope of work for this phase includes the following : 1 ) Demolition of existing steam boilers , steam humidification system , and heating hot water system . 2 ) Demolition of existing steam , condensate , steam humidification , and heating hot water piping . 3 ) Installation of new heating hot water condensing boiler system . 4 ) Installation of new heating hot water loop in basement . 5 ) Basement ventilation fan and louver actuators . 6 ) Flywheel repair scope . c . Scheduling Requirements : 1 ) MoDOT shuts down their heating plant in the late spring / summer time frame and doesn ' t turn heating on until fall . The project design assumes that the Phase 1 work will take place during this shutdown . The Phase also is assumed to be the first or one of the first phases addressed . Provisions in the design have been made for the replacement of the steam portion of the heating system with a heating hot water only heating system including temporary preheat coils for MAU - 1 , MAU - 2 , MAU - 3 , and MAU - 4 . Phase 2 a . Location : This phase consists of the 1st floor corridor and support spaces on the 1st floor . b . The scope of work for this phase includes the following : 1 ) Demolition of existing steam , condensate , steam humidification , and heating hot water piping up through the pipe chase from the basement . Piping accessible in the corridor area shall be demolished . Piping routed into other areas will be capped and removed in subsequent phases . Heating hot water piping demolished in this phase will only be part of the inner loop . 2 ) Demolition of steam coils in MAU - 1 , MAU - 2 , MAU - 3 , and MAU - 4 . 3 ) Install new temporary heating hot water preheat coil in MAU - 1 , MAU - 2 , MAU - 3 , and MAU - 4 . 4 ) The controls for MAU - 1 , MAU - 2 and MAU - 4 will need to be 5 ) Install new heating hot water loop up from the basement and in first floor corridor with shutoffs to accommodate other phases . 6 ) Piping will need to be routed to serve the temporary heating hot water coils . 7 ) The new heating hot water loop will be connected to the existing outer loop . 8 ) Connect AHU - 1 , AHU - 2 , AHU - 3 , AHU - 4 , AHU - 6 , AHU - 7 , MAU - 1 , MAU - 2 , MAU - 3 , and MAU - 4 heating hot water branches to the new heating hot water loop ( these branches were previously connected to the existing inner loop ). 9 ) Air Handling Unit 5 replacement and replacement of corresponding duct , air terminals , exhaust fans , controls , and other system components . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
