Coffin Building Gym Floor Replacement
Sector: Cement • Location: Georgia, United States
Demo gym floor to the bare concrete. Install approximately 10,070 square feet of Aacer MFMA certified floor system to fit existing six-inch slab depression, with 21/4" x 3/4" #2 grade or better MFMA certified, maple over custom sleeper system, on cush pads, over 6mil vapor barrier. Install new cove base to both end of walls and affected wall areas. Drum sand the entire court. Apply game lines, pai
- Status
- Closed
- Sector
- Cement, Commercial
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Coffin Building Gym Floor Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Demo gym floor to the bare concrete. Install approximately 10,070 square feet of Aacer MFMA certified floor system to fit existing six-inch slab depression, with 21/4" x 3/4" #2 grade or better MFMA certified, maple over custom sleeper system, on cush pads, over 6mil vapor barrier. Install new cove base to both end of walls and affected wall areas. Drum sand the entire court. Apply game lines, painting, and staining to match the existing artwork and color scheme. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Cement, Commercial |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
