Combined Project-Billings Cellblock Refresh, Bozeman Wall Addition, Bozeman Freezer Hvac
One of 3,973 tenders Taiyo tracks in Montana.
Source: SAM.gov
The General Services Administration (GSA) is seeking qualified contractors to perform three distinct projects at federal facilities in Montana. Work includes restoration, office construction, and HVAC installation. 1. Billings USMS - Cellblock Refresh Stainless Steel Restoration: Remove scratches from stainless steel benches and walls in: Contractor/USMS/GSA walk-through required to verify exact d
- Status
- Closed
- Sector
- Metal, Steel, Commercial, Residential
- Location
- Bozeman, Montana, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Combined Project-Billings Cellblock Refresh, Bozeman Wall Addition, Bozeman Freezer Hvac
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The General Services Administration (GSA) is seeking qualified contractors to perform three distinct projects at federal facilities in Montana. Work includes restoration, office construction, and HVAC installation. 1. Billings USMS - Cellblock Refresh Stainless Steel Restoration: Remove scratches from stainless steel benches and walls in: Contractor/USMS/GSA walk-through required to verify exact damage locations Painting 2. Bozeman FSA - Office Build-Out Build new wall with metal studs Install door and frame to match existing (type, size, color) Extend wall to deck above Install matching baseboard on new wall Add electrical receptacles if required by code Repair/replace carpet as needed Paint entire room with low VOC paint to match existing Repair affected ceiling grid Relocate fire sprinklers per code Move HVAC ceiling penetrations as needed 3. Bozeman FWS - Freezer HVAC Install heat removal system for ultra-low temperature freezers Maintain room temperature between 64.4°F to 89.6°F per equipment specifications Solution Options: New exhaust system with fresh air supply duct, OR Ductless split-system AC unit with fresh air supply Contractor to investigate and propose solution with pricing GENERAL REQUIREMENTS Provide all labor, materials, equipment, and supervision Comply with all applicable codes and standards Submit detailed cost breakdown and proposed solutions Maintain OSHA and GSA safety standards Coordinate access during business hours HSPD-12 badge required |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Montana |
City | Bozeman |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Metal, Steel, Commercial, Residential |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
