Commerce Park Traffic Impact Study
One of 10,000+ tenders Taiyo tracks in Georgia.
Source: Georgia Purchasing Group
The study shall include analysis of the following intersections : 1 . Douglas Drive and State Route 40 Spur 2 . Westerly intersection of Palmetto Street and Douglas Drive ( evaluation ofsight distance only ) 3 . Douglas Drive and Brickhill Road 4 . Brickhill Road and Builders Drive 5 . Brickhill Road and Dandy St
- Status
- Closed
- Sector
- Road, Bridge, Residential
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Commerce Park Traffic Impact Study
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The study shall include analysis of the following intersections : 1 . Douglas Drive and State Route 40 Spur 2 . Westerly intersection of Palmetto Street and Douglas Drive ( evaluation ofsight distance only ) 3 . Douglas Drive and Brickhill Road 4 . Brickhill Road and Builders Drive 5 . Brickhill Road and Dandy Street 6 . Brickhill Road and Point Peter Road 7 . Dandy Street and State Route 40 8 . Point Peter Road and State Route 40 9 . Point Peter Road at North River Causeway 10 . Proposed new intersection on Point Peter Road that will serve the 990 DU residential development . These intersections are shown on the attached exhibit . 4 . Scope of Services The selected consultant shall : • Collect and analyze existing traffic data ( volumes , turning movements , accident history , etc .) This includes peak and total daily traffic volumes on all arterial , collector and local streets within the study area . Traffic counts should , as a rule , not be more than one year old when the report is prepared . Traffic counts between one and three years old may be used if factored to the current year . Traffic counts older than three years will not be accepted . • Provide a description of all transportation facilities in the study area , including roadway names , locations and functional classifications , intersection lane configurations and intersection traffic control ( including signal timing ), existing rights - of - way , and pedestrian and bicycle facilities . An existing lane configuration sketch shall be submitted for all roadways and intersections within the study area . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Bridge, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
