logo

Commercial Gas Boiler Replacement CB1

Sector: Commercial • Location: United Kingdom

Source: Open Contracting Data Standard (OCDS)

Tender
Active

Replace the commercial boilers (38 years old) with new boilers. Connect back onto the existing pipework system. Check the flow rates prior to commencing the works, noting that all the test points are currently blocked. Electrical wiring of boilers and associated equipment to be delivered within the scope. The control systems are more recent so retain the existing control systems and pipework with

Status
Bidding
Sector
Commercial
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about Commercial Gas Boiler Replacement CB1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Commercial Gas Boiler Replacement CB1” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Replace the commercial boilers (38 years old) with new boilers. Connect back onto the existing pipework system. Check the flow rates prior to commencing the works, noting that all the test points are currently blocked. Electrical wiring of boilers and associated equipment to be delivered within the scope. The control systems are more recent so retain the existing control systems and pipework with only the minimum modifications to integrate the new boilers into the existing system. If modifications to the ventilation, flue and pressurisation units are required, these are to be delivered within the scope. The boilers are located in a dedicated plant room on the ground floor of a single storey pent roof brick building. Provision of scaffolding and any associated safety equipment for working at height ( ie flue) are to be delivered within the scope. Ensure adequate valves including emergency control valves and safety backend valves. Ensure gas supply pipework is adequate size for the boiler system. Removal of asbestos containing materials in any current boiler that needs to be taken off site, to be delivered within the scope. Responsible disposal of waste to be delivered within scope. Access to the plant room is via a paved walkway between two buildings about 1 meter wide. The gas intake room is in the same building separated by a brick wall from the plant room. The plant room has access to a WC. Space can be provided to section off a works area for plant and skip. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Chelmsford:-Central-heating-boilers./KD6S735KA3 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/KD6S735KA3

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Commercial

Article published date

2026-06-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender