Commercial Gas Boiler Replacement CB1
The scope, dates and status of this tender. A free account opens every field.
Source: Find a Tender Service (UK)
Replace the commercial boilers (38 years old) with new boilers. Connect back onto the existing pipework system. Check the flow rates prior to commencing the works, noting that all the test points are currently blocked. Electrical wiring of boilers and associated equipment to be delivered within the scope. The control systems are more recent so retain the existing control systems and pipework with
- Status
- Bidding
- Sector
- Road, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Commercial Gas Boiler Replacement CB1
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Replace the commercial boilers (38 years old) with new boilers. Connect back onto the existing pipework system. Check the flow rates prior to commencing the works, noting that all the test points are currently blocked. Electrical wiring of boilers and associated equipment to be delivered within the scope. The control systems are more recent so retain the existing control systems and pipework with only the minimum modifications to integrate the new boilers into the existing system. If modifications to the ventilation, flue and pressurisation units are required, these are to be delivered within the scope. The boilers are located in a dedicated plant room on the ground floor of a single storey pent roof brick building. Provision of scaffolding and any associated safety equipment for working at height ( ie flue) are to be delivered within the scope. Ensure adequate valves including emergency control valves and safety backend valves. Ensure gas supply pipework is adequate size for the boiler system. Removal of asbestos containing materials in any current boiler that needs to be taken off site, to be delivered within the scope. Responsible disposal of waste to be delivered within scope. Access to the plant room is via a paved walkway between two buildings about 1 meter wide. The gas intake room is in the same building separated by a brick wall from the plant room. The plant room has access to a WC. Space can be provided to section off a works area for plant and skip. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Chelmsford:-Central-heating-boilers./KD6S735KA3 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/KD6S735KA3 |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Road, Commercial |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
