Commercial Internet
Sector: Broadband • Location: Belton, Texas, United States of America
Source: SAM.gov
All regulations and restrictions as they apply on base will also apply for this contract. Must be able to comply with DoD Information Assurance (IA) and Army Cybersecurity policies. Place of Performance: Belton, TX 76513 Period of Performance: Subject to Change Base Year: 15 January 2026 to 14 January 2027 Option Year 1: 15 January 2027 to 14 January 2028 Option Year 2: 15 January 2028 to 14 Janua
- Status
- Closed
- Sector
- Broadband, Aerospace & Defense, Telecommunications, Warehouse, Residential, Government, Commercial
- Location
- Belton, Texas, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Commercial Internet
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | All regulations and restrictions as they apply on base will also apply for this contract. Must be able to comply with DoD Information Assurance (IA) and Army Cybersecurity policies. Place of Performance: Belton, TX 76513 Period of Performance: Subject to Change Base Year: 15 January 2026 to 14 January 2027 Option Year 1: 15 January 2027 to 14 January 2028 Option Year 2: 15 January 2028 to 14 January 2029 Option Year 3: 15 January 2029 to 14 January 2030 Option Year 4: 15 January 2030 to 14 January 2031 Your points of contact regarding this requirement are as follows: Contract Specialist: Chasity.n.griffin.civ@army.mil Contracting Officer: Marcellus.j.newson.civ@army.mil THIS IS A REQUEST FOR INFORMATION Description: This is a non-personal service contract to establish and provide high- speed and secure wireless internet for government, contractors, inventory systems, and security devices throughout a warehouse facility. Complete site survey and network design report. Install and configure internet and LAN/WLAN infrastructure. Test and verify report with performance benchmarks. Install structured cabling (Category 6A or higher) for data drops, access points, and backbone connections. Install and configure managed network switches, routers, and firewalls meeting DoD-compliant security standards. Deploy Wi-Fi 6 (802.11ax) access points ensuring full coverage across the warehouse, administrative offices, and loading zones. Install network racks, patch panels, cable management, and surge protection systems. Perform cable labeling, routing, and certification testing. Conduct a comprehensive site survey to assess building layout, construction type, and existing network infrastructure. Identify suitable cable pathways, equipment rack locations, and access point mounting points. All questions must be submitted no later than 3:00 PM Central Time (UTC-5) on December 26, 2025, to both the Contract Specialist and the Contracting Officer at the above email addresses. E-mail is the preferred method for questions. Please see attachment. |
Original sector | Information |
Location
Country | United States of America (USA) |
State | Texas |
City | Belton |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Broadband, Aerospace & Defense, Telecommunications, Warehouse, Residential, Government, Commercial |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Broadband tenders in United States of America
- Geary Blvd. Sewer and Water Improvements
- Broadband Partnership
- Construction Manager Risk CMAR East Park P0625
- Web Content Management System Replacement
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Design-Build Services for San Joaquin Valley Communication S...
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
