Communications Server Room Construction Project
Sector: Road • Location: Missouri, United States of America
Source: Missouri Purchasing Group
Awarded contractor will complete all aspects of demolition and construction for this turnkey project to create a separate server room area within the existing office spaces as described in these documents and plan set . This site is mainly in use Monday – Friday by City Staff and authorized visitors . Sta
- Status
- Closed
- Sector
- Road, Metal, Steel, Commercial, Residential
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Communications Server Room Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Awarded contractor will complete all aspects of demolition and construction for this turnkey project to create a separate server room area within the existing office spaces as described in these documents and plan set . This site is mainly in use Monday – Friday by City Staff and authorized visitors . Staff members and authorized visitors will be conducting normal operations during the entirety of this project . City project manager will work with the awarded bidder to establish a plan that minimizes significant disruption for the location . Governing standards for all work being performed Bid must include all labor , materials and equipment to perform the work described within Section L . The city has elected to provide select materials as listed in these documents , The provision of all other materials necessary to complete this scope are the bidder ’ s responsibility . Standards and Regulations : All work must conform to the requirements listed below : A . IBC - International Building Code B . NFPA 70 - NEC - National Electric Code C . IMC - International Mechanical Code D . ASTM - American Society for Testing and Materials E . AHJ - Authority having Jurisdiction F . ADA – Americans with Disabilities Act G . IFC – International Fire Code H . AISI – American Iron and Steel Institute Site Coordination / Conditions : During construction it will be necessary to ensure Access and Life Safety Egress to / from the site . The city will provide a dumpster during construction for demolition and construction debris , placed on pavement on our facility lot . The entire project will be completed in a section of the building that has a Tate ® raised panel flooring system . Prior to work commencing city staff will remove any furniture , fixtures and equipment ( See Note Below ) to provide access for construction activities . Awarded bidder shall meet with project manager 1 week prior to construction starting to ensure site is accessible and prepared for construction for the contractor . Note : Servers will remain active within the project area during all facets of construction scope . Contractor must take precautions to limit generation of dust and debris . If required , temporary lighting in the construction area must be provided by the contractor and is considered incidental to the project |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Metal, Steel, Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
