logo

Competition - Framework agreement for renovation no-dig, water pipelines including manholes.

Contract notice · Norway · Last reported Sep 2026

Source: TED Europa

Tender
Contract Notice

The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Rail, Road, Power Transmission, Power Generation (CCGT)
Location
Norway
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about Competition - Framework agreement for renovation no-dig, water pipelines including manholes.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Competition - Framework agreement for renovation no-dig, water pipelines including manholes.” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Norway.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The framework agreement is for the renovation of water pipelines and manholes when blocking out. Controlled drilling, pilot pipe drilling and hose renovation are not included in the framework agreement. The aim of the framework agreement is to cover the need for renovation of water pipelines, where blocking out can be used as a method, as well as renovation of manholes and re-connection of private service pipes. In addition to blocking out, there will be a limited need for renovation by using traditional trench excavation in cases where blocking out cannot be carried out. The contracting authority is planning for two call-offs per annum, with each call-off consisting of packing several measures. The contracting authority plans to renovate approx. 3,000 metres per annum and increase the number of metres during the contract period. The actual extent will vary, however, and the contracting authority is not obligated to the above mentioned estimate. In addition to planned measures, urgent orders may occur. The framework agreement ́s estimated financial framework, including an option for an extension, is NOK 415,000,000,-, while the maximum limit is NOK 600,000,000,-. This is based on a calculation of the estimated price of 3,000 metres per annum, which can be increased to 4,000 metres per annum. The framework agreement period is 2 + 1 + 1 + 1 + 1 years.

Original sector

Construction work, Construction work, Construction work, Construction work, Construction work

Location

Country

Norway

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Waste Processing and Treatment, Rail, Road, Power Transmission, Power Generation (CCGT)

Article published date

2026-09-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender