Comprehensive study on the need to update and enhance emergency and restoration activities and actors in view of the evolution of the power system
Sector: Power Generation (CCGT) • Location: European Union
Source: TED Europa
This action aims to ensure a more resilient electricity system in the decarbonised era when facing emergency situations and to avoid total blackouts. It is crucial to assess the need to update how the grid is managed during different types of extreme situations untapping the capabilities that new assets and tools can provide to cope with the situation . The expected result is to propose a range
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Unknown (Europe)
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Comprehensive study on the need to update and enhance emergency and restoration activities and actors in view of the evolution of the power system
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This action aims to ensure a more resilient electricity system in the decarbonised era when facing emergency situations and to avoid total blackouts. It is crucial to assess the need to update how the grid is managed during different types of extreme situations untapping the capabilities that new assets and tools can provide to cope with the situation . The expected result is to propose a range of services, tools and techniques to efficiently modernise grid operations and planning actions during emergency and restoration states. This analysis includes, enhancing grid observability, early warning systems and controllability, to support TSO and DSO control rooms operators in critical situations, ensuring the protection of critical and vulnerable electricity customers, exploring blackstart protocols based on grid forming inverters, and the use of microgrids and facilitating swift recovery after a blackout by leveraging digitalization, AI and other advanced tools. |
Original sector | Research and development services and related consultancy services |
Location
Country | Unknown (Europe) |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-03-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in European Union
- WN-3210080589 - 20kV Petersenspulen (50-600A) für die Umspannwerke Albern, Achau und Aspern (insgesamt 6 Stück)
- Virtuaalse elektrijaama lahenduse ost
- Wykonanie robót budowlanych na odcinku Lębork–Słupsk bez stacji Słupsk km 81,150–128,600 linii kolejowej nr 202 w ramach projektu pn. "Prace na linii kolejowej nr 202 (...)"
- RENOVATION FONCTIONNELLE ET THERMIQUE BATIMENT DEPARTEMENTAL 23 RUE D'ARCOLE 42000 SAINT ETIENNE
- Accord-cadre multi-attributaires à marchés subséquents pour la fourniture de carburant pour la station-service du site Val d'Arly
- Accord-Cadre de prestation de commissionnaire de transport
- Een raamovereenkomst voor de levering van enerzijds 100% groene elektriciteit, injectie (perceel 1) en aardgas (perceel 2)
- Zaprojektowanie i wykonanie robót budowlanych dla zadania pod nazwą „Kompleksowa poprawa układu komunikacyjnego na odcinku DK7 Kraków- Libertów- Gaj
