Concrete Finishing Labor
The scope, dates and status of this tender. A free account opens every field.
Source: Alabama Purchasing Group
SPECIAL CONDITIONS AND TECHNICAL SPECIFICATIONS CONCRETE FINISHING WORK The following obligations by the Mobile County Public School System and the Contractor shall apply : A . The Mobile County Public School System shall be responsible for the following : 1 . Purchasing of all required concrete material . 2 . Direct
- Status
- Closed
- Sector
- Power Transmission, Cement, Power Generation (CCGT)
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about Concrete Finishing Labor
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SPECIAL CONDITIONS AND TECHNICAL SPECIFICATIONS CONCRETE FINISHING WORK The following obligations by the Mobile County Public School System and the Contractor shall apply : A . The Mobile County Public School System shall be responsible for the following : 1 . Purchasing of all required concrete material . 2 . Directing and inspection of work to be performed . B . The Contractor shall be responsible for the following : 1 . All engineering , layout , setting of grades , etc . 2 . Removal and hauling of concrete or other material . Contractor can haul to the landfill , or other city designated area , and dispose of said debris at no charge . 3 . Grading of all areas and preparation of proper base for placement of concrete . 4 . Placing and compacting rock base . 5 . Furnishing all equipment to perform the work , backhoes , dump trucks , saws , specialty equipment , etc . The Mobile County Public School System shall not be invoiced for any equipment that the contractor needs to rent in order to perform the job . 6 . Forming , placing , jointing , and finishing as required and / or directed by the MCPSS ( to include light broom finish , edged and hand tool joints as directed by MCPSS ). 7 . Removal of forms and any other bracing material . 8 . Furnishing all forming material , forms and finishing tools . 9 . All underground utility locations . 10 . Cleaning of area , disturbed or not . 11 . All traffic control , to the current ALDOT standards . Contractor may request assistance from the board . However , MCPSS is under no obligation , and assumes no liability . Contractor shall be responsible for replacing signs that are lost or stolen while being borrowed from the MCPSS . 12 . Providing appropriate detour routes according to ALDOT standards as the MCPSS deems necessary . 13 . Excavation as needed . 14 . Delivery of material ( i . e . rock , concrete , straw , seed , etc .) to job site , either by use of contractor ' s trucks or by calling for delivery , including delivery and removal of barricades . 15 . Sawing of old concrete , as directed , to provide smooth joints . 16 . Adjustments to existing manholes , valve boxes , castings , etc .; to meet new grades . 17 . Any damage to existing trees . 18 . Furnishing barricades , barrels , etc . 19 . All backfilling , seeding and strawing . |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Cement, Power Generation (CCGT) |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- Utility Management System and Services UMSS
- FY2023 Patch Truck
- Desert Willow Perimeter Landscape and Lighting Rehabilitation Phase 2 Project
