logo

Consolidated Food Service Facility Mechanical Systems and Operations Feasibility Study

Sector: Commercial • Location: Madison, Wisconsin, United States of America

Source: Open Gov Tenders

Tender
Open

The feasibility study should examine the Consolidated Food Services (CFS) building through a long-term lens, no imminent design is expected to commence from this feasibility study. The consultant should examine HVAC impacts, building envelope, and cooking operations impacts, as well as other possible considerati

Tender Information FAQ

Tender Information

4 Q
The tender “Consolidated Food Service Facility Mechanical Systems and Operations Feasibility Study” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Madison, Wisconsin, United States of America.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

open

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

<span style="text-decoration: underline;"><strong>Feasibility Study</strong></span><br>The feasibility study should examine the Consolidated Food Services (CFS) building through a long-term lens, no imminent design is expected to commence from this feasibility study. The consultant should examine HVAC impacts, building envelope, and cooking operations impacts, as well as other possible considerations.The overall study should include four main components:<br>1. &nbsp; &nbsp;A condition assessment and recommendations regarding existing cooking operations<br>&bull; &nbsp; &nbsp;Physical equipment<br>&bull; &nbsp; &nbsp;Cooking workflows<br>2. &nbsp; &nbsp;An examination of conversion of the building and operations to a low temperature hydronic configuration<br>3. &nbsp; &nbsp;An examination of conversion of the building and operations to a high temperature hydronic configuration<br>4. &nbsp; &nbsp;An examination of no conversion to hydronic but utilizing the existing boiler and air handler in a more energy efficient way considering energy and/or heat recovery.For components 1-4, opinions of probable costs should be provided, as well as written explanations, conceptual schematics, phasing considerations, etc, required to pursue that component.&nbsp;&nbsp;

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data