logo

Construction : Charlemagne Roof Replacement Project

Bids closed Apr 2026 · Oregon · Last reported Apr 2026

Source: Oregon Purchasing Group

Tender
Closed

3 . 04 INSTALLATION OF SELF - ADHERING VAPOR RETARDER / AIR BARRIER / TEMPORARY ROOFING A . Install primer as required by membrane manufacturer . B . Install self - adhering sheet membrane wrinkle free . Apply primer if required by membrane manufacturer . Comply with temperature restrictions of membrane manufacturer for instal

Status
Closed
Sector
Metal, Forest Products and Packaging, Steel, Water Supply and Storage, Road
Location
Oregon, United States of America
Updated
3 Nov 2026
Source
Oregon Purchasing Group

ConstructChat

Ask ConstructChat about Construction : Charlemagne Roof Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Construction : Charlemagne Roof Replacement Project” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Oregon, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

3 . 04 INSTALLATION OF SELF - ADHERING VAPOR RETARDER / AIR BARRIER / TEMPORARY ROOFING A . Install primer as required by membrane manufacturer . B . Install self - adhering sheet membrane wrinkle free . Apply primer if required by membrane manufacturer . Comply with temperature restrictions of membrane manufacturer for installation . Apply over entire roof , in shingle fashion to shed water , with end laps of not less than 6 inches staggered 24 inches between courses . Overlap side edges not less than 4 inches . Roll laps with roller . Cover membrane within 28 days . C . All transitions , including but not limited to wood blocking and fall arrest stanchions , shall be treated with a 1 inch by 1 inch minimum fillet of sealant to ease transition of the membrane sheets . Seal transitions air tight . D . Vertical offsets that are 1 / 8 inch shall be pre - treated with an 8 inch wide strip of membrane centered over the joint . Vertical offsets greater than 1 / 8 inch shall be repaired to bring them into conformance with the project specifications . E . Sheet installation shall be done in such a way as to avoid stretching membrane while removing release paper . It is recommended that sections of membrane be pre - cut to no more than 12 feet in length and allowed to fully relax prior to application . F . Patch misaligned or inadequately lapped seams with membrane . Slit any fishmouths , overlap the flaps , and repair with a patch of membrane and roll in place . G . At vent , fall arrest stanchions , and similar penetration locations , cut sheet around base of penetrations . Apply 1 inch sealant fillet at vertical transition . Install 24 inch square membrane target sheet centered on stanchion , tightly lapping up onto stanchion 3 inches minimum . Install stainless steel clamp ring and seal top edge with sealant for airtight flashing installation . H . Flashing strips used to seal edges of transition or edge sections of membrane coated sheet metal shall be provided with 3 inch minimum laps onto primed sheet metal and membrane sheets unless otherwise noted on Drawings . I . Turn membrane up wall surfaces and onto wood blocking as shown on Drawings . Seal top edge of overlap with sealant . 3 . 05 INSTALLATION POLYISOCYANURATE INSULATION A . Only install as much insulation as can be covered in a day ’ s roofing operation , and do not leave exposed to precipitation . B . Warped or bent insulation boards or boards with damaged facers shall not be used . C . Provide sizes to fit applications indicated and selected from manufacturer ’ s standard thicknesses , widths , and lengths . D . If installed in two layers , install with long joints in continuous straight lines with end joints staggered , with second layer transverse to first layer , with joints staggered at least one - third of overall length from those of first layer . E . Install in layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches in each direction . 1 . All layers to be adhered with adhesive . 2 . Apply ribbons of bead - applied adhesive at coverage rate specified by the manufacturer to achieve the project uplift rating . Allow adhesive to rise or set up according to the manufacturer ’ s recommendations ...

Location

Country

United States of America (USA)

State

Oregon

Source

Source

Oregon Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Forest Products and Packaging, Steel, Water Supply and Storage, Road

Article published date

2026-05-11

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender