Construction and commission of modular rig
Planning · United Kingdom
Source: Open Contracting Data Standard (OCDS)
UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical asse
- Status
- Prospective
- Sector
- Nuclear, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Construction and commission of modular rig
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. 2. Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network 1. Project Overview UKNNL is seeking expressions of interest from suitably qualified and experienced contractors to support the assembly, installation verification, and inactive commissioning of a new modular experimental rig at the Preston facility. The rig comprises a modular, three-storey structure incorporating multiple process and utility services. The appointed contractor will be responsible for mechanical assembly, installation checks, and inactive commissioning (without uranics) to enable active commissioning (with uranics) by others. ________________________________________ 2. Scope of Work The contractor will be expected to undertake, as a minimum: Mechanical Assembly • Offloading, positioning, and installation of prefabricated rig modules • Mechanical assembly and integration of modules to form the complete structure • Installation of access platforms, supports, and ancillary equipment • Alignment, fixing, and structural integrity checks Interface & Service Readiness • Preparation and verification of interfaces for: o Gas services o Extraction/ventilation o Fluids o Electrical supplies • Coordination with service installation contractors • Ensuring connection points are accessible, correctly labelled, and compliant with drawings/specifications Electrical, Controls and Instrumentation: • Cross module connections • Final install • Connection to Pilot Plant electrical distribution network Installation Verification • Completion of installation checks against drawings and specifications • QA/QC inspections and documentation • Identification and resolution of defects or non-conformances • As-built documentation and redlining Inactive Commissioning • Mechanical completion checks • Pressure/leak testing (where applicable) • Functional checks (non-energised / non-process) • Safety and compliance verification • Handover documentation and commissioning packs ________________________________________ 3. Contractor Requirements Interested parties should demonstrate: • Experience assembling modular or multi-storey industrial/process rigs or plant • Experience working with multi-disciplinary service interfaces (gas, fluids, extraction, electrical) • Commissioning and mechanical completion experience • Strong health, safety, and quality management systems to comply with CDM regulations • Ability to work within an operational facility environment • Relevant certifications and competencies ________________________________________ 4. Deliverables The appointed contractor will be expected to provide: • Method statements and risk assessments • Installation and commissioning plans • Inspection and test records • Mechanical completion dossiers • As-built documentation • Handover pack ________________________________________ 5. Programme (Indicative) • Site readiness: June 2026 • Assembly period: 3 months • Handover to active commissioning: September 2026 |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Nuclear, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Nuclear tenders in United Kingdom
- Diagnostic and Capital Equipment and Related Accessories and Services
- Purchase of electronics pod
- HPB - Provision of Radioactive Waste Management Services (AGR Unique Ref. 34 F/W)
- University Interactions - NDA Research Portfolio - Single Supplier Framework
- Manufacturability Assessment of the PEGASUS Transport Package Design
- Collection of Chemical Waste and Paints (Hazardous and Non-Hazardous)
- Manufacture, Supply & Installation of Pipework System
- Manufacture, Supply & Installation of Pipework System
