logo

Construction for Stream & Floodplain Restoration Project in South Hero , VT

Bids closed Feb 2026 · Vermont · Last reported Jan 2026

Source: Vermont Purchasing Group

Tender
Closed

Work tasks will generally involve site access and staging ; installation and removal of temporary erosion and sediment controls ; excavation and grading to construct floodplain benches along an unnamed tributary to Keeler Bay ( generally up to 25 feet wide ) to improve floodplain access ; instream excavation and s

Status
Closed
Location
Vermont, United States of America
Updated
3 Nov 2026
Source
Vermont Purchasing Group

ConstructChat

Ask ConstructChat about Construction for Stream & Floodplain Restoration Project in South Hero , VT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Construction for Stream & Floodplain Restoration Project in South Hero , VT” is a tender record in Taiyo. It is issued for works, goods, or services related to Vermont, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Work tasks will generally involve site access and staging ; installation and removal of temporary erosion and sediment controls ; excavation and grading to construct floodplain benches along an unnamed tributary to Keeler Bay ( generally up to 25 feet wide ) to improve floodplain access ; instream excavation and shaping ; installation of approximately four stone grade control structures to stabilize existing headcuts and tie into existing stream grade ; backfilling and stabilization of eroding headcut areas with stone ; protection of existing underground utilities including a septic force main ; hauling , placement , and grading of excavated materials ; stream channel stabilization and restoration ; site stabilization including seeding , mulching , erosion control matting , and final grading ; and restoration of pre - construction or improved conditions of all disturbed areas ( see Attachment A ). Instream structures and grading may require field adjustments at the time of construction to reflect existing conditions . The contractor shall coordinate closely with the Project Engineer to field - fit stone grade controls and associated earthwork to meet performance standards and protect existing infrastructure .

Location

Country

United States of America (USA)

State

Vermont

Source

Source

Vermont Purchasing Group

URL

More Details

Record type

Tender

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender