Construction Manager at Risk for Air Traffic Control Tower
The scope, dates and status of this tender. A free account opens every field.
Source: Nevada
This project will be for pre-construction and construction services for a new Air Traffic Control Tower (“ATCT”) at the Boulder City Municipal Airport (owned and operated by the City of Boulder City). The project shall be performed under two contracts, one for Pre-Construction Services and one for Construction Services. The ATCT structure will be approximately 126 feet above ground level (AGL) to
- Status
- Closed
- Sector
- Airport, Government
- Location
- Nevada, United States of America
- Updated
- 3 Nov 2026
- Source
- Nevada
ConstructChat
Ask ConstructChat about Construction Manager at Risk for Air Traffic Control Tower
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project will be for pre-construction and construction services for a new Air Traffic Control Tower (“ATCT”) at the Boulder City Municipal Airport (owned and operated by the City of Boulder City). The project shall be performed under two contracts, one for Pre-Construction Services and one for Construction Services. The ATCT structure will be approximately 126 feet above ground level (AGL) to the top of the tower with a cab floor height of approximately 93 feet AGL. The ATCT will consist of 9 levels, and the tower control cab will be approximately 500 square feet and will provide four air traffic controller workstations as shown on the project plans. |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Nevada |
URL |
More Details
Record type | Tender |
Sector | Airport, Government |
Article published date | 2026-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Airport tenders in United States of America
- Fuel Tank Inspection and Repair Services
- Tacoma Narrows Airport TIW Taxiway Relocation Improvements Project
- Cargo Apron Reconstruction and Replacement of Runway 927 with a Taxiway
- Fall Protection for Airport Jet Bridges
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
