Construction Manager at Risk Services for South Park Community Center Project
The scope, dates and status of this tender. A free account opens every field.
Source: North Carolina Purchasing Group
The CM contract will be performed in THREE Phases which are as follows : PHASE I PRE - CONSTRUCTION SERVICES Project Review The CM shall serve as an integral part of the Project Team and shall meet with the Town , the Project Design Team , consultants , other design team members and stakeholders to full
- Status
- Closed
- Sector
- Warehouse, Commercial
- Location
- North Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- North Carolina Purchasing Group
ConstructChat
Ask ConstructChat about Construction Manager at Risk Services for South Park Community Center Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The CM contract will be performed in THREE Phases which are as follows : PHASE I PRE - CONSTRUCTION SERVICES Project Review The CM shall serve as an integral part of the Project Team and shall meet with the Town , the Project Design Team , consultants , other design team members and stakeholders to fully understand the design program , the design documents , the project scope , and all other pertinent aspects of the Project . The CM shall develop written project procedures in cooperation with the Town and other members of the Project Team that will be used as a guide for the management and coordination of this project throughout the life of the project . Consultation Services The CM shall attend regularly scheduled meetings with the Town , the Project Design Team , consultants , and other design team members and stakeholders to advise them on matters relating to site use , improvements , selection of materials , building methods , construction details , building systems and equipment , phasing , logistics , and sequencing . The CM shall provide written recommendations to the Town on construction feasibility . Value Analysis The Construction Manager shall evaluate the sequential and final construction documents and obtain an understanding of the intent of the Town and the Project Designer . The CM shall provide value analysis services and offer cost savings suggestions and best value recommendations to the Town at sequences of design completion , acceptable to the Town , and appropriate to the level of completeness of the design documents . All recommendations shall be in writing , detailed budget and schedule impacts must be fully reviewed with the Project Design Team and Town and approved by the Town prior to implementation . Value analysis efforts shall result in a design that is most effective in first , costs , as well as long term operational costs relative to issues of energy use and facility maintainability . Value analysis studies shall include life cycle cost analysis as may be required to assist the Project Designer to achieve an appropriate balance between costs , aesthetics , and function . Value analysis efforts shall also take into consideration applicable constructability issues including but not limited to an analysis of site , budget , schedule , and quality risks . The CM shall promptly notify the Town and Project Design Team in writing upon observing any features in the design that appear to be incomplete , out of sequence , ambiguous , confusing , conflicting , or non - standard to industry practices . All value analysis studies must be provided on a timely basis within the schedule and shall be supported by validated facts , research , and actual cost data . Value analysis studies shall be continuous as the design is being developed . Schedule The CM shall utilize standard industry scheduling software to prepare , provide , and maintain appropriately detailed Critical Path Method schedules during pre - construction and construction phases of work . Scheduling software shall allow for incorporation of design changes resulting from constructability reviews and value analyses and provide for coordination of all work to be performed . The scheduling software shall be capable of producing and coordinating logic developed network diagrams , and tabular reports accurately depicting the critical path and milestone activities . Schedule shall incorporate all phases of construction work with detail of areas under construction . The CM shall submit the schedule electronically , both in pdf and native - format , and provide regular updates as required by the Town . The project schedule shall be sufficiently detailed to allow for a realistic projection of design activity sequences and durations . The submitted schedule shall be a complete schedule update , showing all relationships and the project ' s critical path ( s ) up through and including a realistically attainable substantial completion date . Column information displayed shall include total float and the submittal shall include a printout of a comparison report of the latest schedule compared against the previously submitted project schedule . Updated schedules will be required at the end of each Design phase established by the contract between the Town and the Designer , and after major value engineering decisions . Within thirty ( 30 ) days from the Notice to Proceed , the CM is to establish a detailed CPM schedule of the pre - construction / design phase with the concurrence of the Town and the Project Designer . The CM is responsible for monitoring this schedule during the preconstruction / design phase , ensure that this schedule is updated , and advise the Town of any deficiencies in adhering to this schedule by any party . |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | North Carolina Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Warehouse, Commercial |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Warehouse tenders in United States of America
- 10K Capacity Forklift
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- NEW WAREHOUSE BUILDING FOR OCEAN COUNTY HEALTH DEPARTMENT
- 24C4 Warehouse Racking System
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Cargo Way Flush Line
- Southeast Water Pollution Control Plant Biosolids Digester F...