logo

Construction Manager at Risk Services for South Park Community Center Project

The scope, dates and status of this tender. A free account opens every field.

Source: North Carolina Purchasing Group

Tender
Closed

The CM contract will be performed in THREE Phases which are as follows : PHASE I PRE - CONSTRUCTION SERVICES Project Review  The CM shall serve as an integral part of the Project Team and shall meet with the Town , the Project Design Team , consultants , other design team members and stakeholders to full

Status
Closed
Sector
Warehouse, Commercial
Location
North Carolina, United States of America
Updated
3 Nov 2026
Source
North Carolina Purchasing Group

ConstructChat

Ask ConstructChat about Construction Manager at Risk Services for South Park Community Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Construction Manager at Risk Services for South Park Community Center Project” is a tender record in Taiyo, linked to the Warehouse sector. It is issued for works, goods, or services related to North Carolina, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The CM contract will be performed in THREE Phases which are as follows : PHASE I PRE - CONSTRUCTION SERVICES Project Review  The CM shall serve as an integral part of the Project Team and shall meet with the Town , the Project Design Team , consultants , other design team members and stakeholders to fully understand the design program , the design documents , the project scope , and all other pertinent aspects of the Project .  The CM shall develop written project procedures in cooperation with the Town and other members of the Project Team that will be used as a guide for the management and coordination of this project throughout the life of the project . Consultation Services  The CM shall attend regularly scheduled meetings with the Town , the Project Design Team , consultants , and other design team members and stakeholders to advise them on matters relating to site use , improvements , selection of materials , building methods , construction details , building systems and equipment , phasing , logistics , and sequencing . The CM shall provide written recommendations to the Town on construction feasibility . Value Analysis  The Construction Manager shall evaluate the sequential and final construction documents and obtain an understanding of the intent of the Town and the Project Designer . The CM shall provide value analysis services and offer cost savings suggestions and best value recommendations to the Town at sequences of design completion , acceptable to the Town , and appropriate to the level of completeness of the design documents . All recommendations shall be in writing , detailed budget and schedule impacts must be fully reviewed with the Project Design Team and Town and approved by the Town prior to implementation .  Value analysis efforts shall result in a design that is most effective in first , costs , as well as long term operational costs relative to issues of energy use and facility maintainability . Value analysis studies shall include life cycle cost analysis as may be required to assist the Project Designer to achieve an appropriate balance between costs , aesthetics , and function .  Value analysis efforts shall also take into consideration applicable constructability issues including but not limited to an analysis of site , budget , schedule , and quality risks .  The CM shall promptly notify the Town and Project Design Team in writing upon observing any features in the design that appear to be incomplete , out of sequence , ambiguous , confusing , conflicting , or non - standard to industry practices .  All value analysis studies must be provided on a timely basis within the schedule and shall be supported by validated facts , research , and actual cost data .  Value analysis studies shall be continuous as the design is being developed . Schedule  The CM shall utilize standard industry scheduling software to prepare , provide , and maintain appropriately detailed Critical Path Method schedules during pre - construction and construction phases of work .  Scheduling software shall allow for incorporation of design changes resulting from constructability reviews and value analyses and provide for coordination of all work to be performed . The scheduling software shall be capable of producing and coordinating logic developed network diagrams , and tabular reports accurately depicting the critical path and milestone activities . Schedule shall incorporate all phases of construction work with detail of areas under construction .  The CM shall submit the schedule electronically , both in pdf and native - format , and provide regular updates as required by the Town . The project schedule shall be sufficiently detailed to allow for a realistic projection of design activity sequences and durations . The submitted schedule shall be a complete schedule update , showing all relationships and the project ' s critical path ( s ) up through and including a realistically attainable substantial completion date . Column information displayed shall include total float and the submittal shall include a printout of a comparison report of the latest schedule compared against the previously submitted project schedule .  Updated schedules will be required at the end of each Design phase established by the contract between the Town and the Designer , and after major value engineering decisions .  Within thirty ( 30 ) days from the Notice to Proceed , the CM is to establish a detailed CPM schedule of the pre - construction / design phase with the concurrence of the Town and the Project Designer . The CM is responsible for monitoring this schedule during the preconstruction / design phase , ensure that this schedule is updated , and advise the Town of any deficiencies in adhering to this schedule by any party .

Location

Country

United States of America (USA)

State

North Carolina

Source

Source

North Carolina Purchasing Group

URL

More Details

Record type

Tender

Sector

Warehouse, Commercial

Article published date

2026-05-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender