Construction Of Dormitory At Joint Base Langley-Eustis, Hampton, Va
Sector: Cement • Location: Joint Base Langley-Eustis Hampton, VA United States
Source: SAM.gov
Construct a dormitory with all necessary spaces to house 144 enlisted personnel at Joint Base Langley-Eustis. The construction includes 12 accessible rooms, compacted fill above the 100-year flood plain, reinforced concrete foundations and floor slabs, structural steel frame at building core and load bearing metal studs at building wings. The exterior walls are brick facade, precast concrete base,
- Status
- Closed
- Sector
- Cement, Metal, Aerospace & Defense, Power Transmission, Oil and Gas, Wind, Power Generation (CCGT), Commercial, Steel, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Construction Of Dormitory At Joint Base Langley-Eustis, Hampton, Va
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Construct a dormitory with all necessary spaces to house 144 enlisted personnel at Joint Base Langley-Eustis. The construction includes 12 accessible rooms, compacted fill above the 100-year flood plain, reinforced concrete foundations and floor slabs, structural steel frame at building core and load bearing metal studs at building wings. The exterior walls are brick facade, precast concrete base, and limited metal panel walls and glass storefront in building core and entrances. The roof system is a structural steel frame with trusses at building wings and open web joists at building core and a standing seam metal roofing on building wings and low slope single-ply membrane roofing system on building central core. The project includes long-run outside plant communications and manhole/duct system pathway, connections to existing installation utility infrastructure, providing capacity to support facility loads. The project will include all necessary utilities, site preparation, pavements, site improvements, communication, remediation of petroleum contaminated soil within the footprint, security enhancements, area lighting, removal of utilities, and all necessary supporting work for a complete and usable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable codes and design guides. Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01 General Building Requirements. This project will comply with Department of Defense anti-terrorism/force protection requirements per Unified Facilities Criteria 4-010-01. Please see the attached Presolicitation Notice for additional information. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Cement, Metal, Aerospace & Defense, Power Transmission, Oil and Gas, Wind, Power Generation (CCGT), Commercial, Steel, Residential |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
