Construction of M3 Cimislia Bypass, km 18+700-km 26+138
One of 2,192 tenders Taiyo tracks in Moldova.
Source: TED Europa
The project “Construction Works on M3 Cimislia bypass, 7.4 km” consists in the construction of a new road. Cimislia Bypass Road is an extension of the M3 road that bypasses Cimislia city to the northwest and reconnects with the M3 road south of Cimislia. The works to be carried out includes the new road construction including arrangement of side roads to the agricultural fields and arrangement of
- Status
- Closed
- Sector
- Power Transmission, Road, Power Generation (CCGT), Raw Materials
- Location
- Moldova
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Construction of M3 Cimislia Bypass, km 18+700-km 26+138
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project “Construction Works on M3 Cimislia bypass, 7.4 km” consists in the construction of a new road. Cimislia Bypass Road is an extension of the M3 road that bypasses Cimislia city to the northwest and reconnects with the M3 road south of Cimislia. The works to be carried out includes the new road construction including arrangement of side roads to the agricultural fields and arrangement of minor intersections. Construction of retaining wall and underground drainage system (manholes), slope protection, bridges and overpasses constructions. Arrangement of drainage facilities as construction of the culverts, consolidated lined side drains and outside interception ditches. The pavement structure consists of construction of the embankment, base course, stabilized base, and new asphalt layers. Project include the arrangement of power lines of 10kV – 110kV, arrangement of underground communication cables, and arrangement of gas lines. Time for Works’ Completion is 30 months, and 24 months of the Defects Notification Period. |
Original sector | Construction work |
Location
Country | Moldova |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Road, Power Generation (CCGT), Raw Materials |
Article published date | 2026-03-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in Moldova
- Lucrări de reparație capitală a drumului public național G108 M5-Florești-Anenii Noi (km 0,00 - 9,00), Etapa II.
- Lucrări de trasare a fibrei optice pe LEA 110 kV și în stațiile electrice
- Construction of M3 Cimislia Bypass, km 18+700-km 26+138
- Moldova: Construction of a high-voltage electricity transmission line Balti - Suceava (400kV OHL) Re-advertisement
- Construction of M3 Cimislia Bypass, km 18+700-km 26+138
- Design services and execution of works within the project “Rehabilitation of the Roman – Iași – Frontier Railway Line – Stage I – Electrification of the Iași – Border (RO) – Ungheni (MD) Railway Line”
- Lucrări de reparație a drumului G104 Ialoveni - Costești - Molești - Razeni - M3, sectorul km 2,60 – 8,67 (sectorul de drum or. Ialoveni - s. Costești)
- Construction of M3 Cimislia Bypass, km 18+700-km 26+138
