logo

Construction of M3 Cimislia Bypass, km 18+700-km 26+138

Sector: Power Transmission • Location: Luxembourg

Source: European Investment Bank (EIB)

Tender
On Going

The project “Construction Works on M3 Cimislia bypass, 7.4 km” consists in the construction of a new road. Cimislia Bypass Road is an extension of the M3 road that bypasses Cimislia city to the northwest and reconnects with the M3 road south of Cimislia. The works to be carried out includes the new road construction including arrangement of side roads to the agricultural fields and arrangement of

Status
Prospective
Sector
Power Transmission, Raw Materials, Road, Power Generation (CCGT)
Location
Luxembourg
Updated
3 Nov 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about Construction of M3 Cimislia Bypass, km 18+700-km 26+138

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Construction of M3 Cimislia Bypass, km 18+700-km 26+138” is a tender record in Taiyo, linked to the Power Transmission sector. It is issued for works, goods, or services related to Luxembourg.

Participants

Not available for this record.

Status

Original status

on going

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The project “Construction Works on M3 Cimislia bypass, 7.4 km” consists in the construction of a new road. Cimislia Bypass Road is an extension of the M3 road that bypasses Cimislia city to the northwest and reconnects with the M3 road south of Cimislia. The works to be carried out includes the new road construction including arrangement of side roads to the agricultural fields and arrangement of minor intersections. Construction of retaining wall and underground drainage system (manholes), slope protection, bridges and overpasses constructions. Arrangement of drainage facilities as construction of the culverts, consolidated lined side drains and outside interception ditches. The pavement structure consists of construction of the embankment, base course, stabilized base, and new asphalt layers. Project include the arrangement of power lines of 10kV – 110kV, arrangement of underground communication cables, and arrangement of gas lines. Time for Works’ Completion is 30 months, and 24 months of the Defects Notification Period.

Location

Country

Luxembourg

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Tender

Sector

Power Transmission, Raw Materials, Road, Power Generation (CCGT)

Article published date

2026-03-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender