Construction of Nikšić Wastewater Management System – Sewerage Network Phase II
Sector: Waste Processing and Treatment • Location: Nikšić, Montenegro
Source: TED Europa
Construction of a wastewater collection network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža). The total length of the network is app 41 km and consists of the following pipe diameters and manhole • Ø 300 mm, L=1,960 m • Ø 250 mm, L=3,750 m • Ø 200 mm, L=30,510 m • House connections, Ø 200 mm, L=5,000 m • Manholes, total 3,600 pcs Corruga
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Cement
- Location
- Nikšić, Montenegro
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Construction of Nikšić Wastewater Management System – Sewerage Network Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Construction of a wastewater collection network for four settlements located at the North of the City centre (Dragova Luka, Ćemenca, Oštrovac and Rubeža). The total length of the network is app 41 km and consists of the following pipe diameters and manhole • Ø 300 mm, L=1,960 m • Ø 250 mm, L=3,750 m • Ø 200 mm, L=30,510 m • House connections, Ø 200 mm, L=5,000 m • Manholes, total 3,600 pcs Corrugated PE pipes is the collector’s material and concrete is the manhole material. - Construction of a new sewerage pumping station called "Cemenca" (Q=50 l/s; H=9 m, P=5 kW), and a pressure line diameter of Ø200 mm with a length of 165 m. The wastewater will be pumped through the pressure line to the existing pumping station "Duklo". - Rehabilitation of the existing pumping station "Duklo (Q=72 l/s; P=30 kW). As major part of the rehabilitation efforts, the existing manual screen will be replaced with an automated one. |
Original sector | Construction work |
Location
Country | Montenegro |
City | Nikšić |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage, Cement |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in Montenegro
- Construction of Nikšić Wastewater Management System – Sewerage Network Phase II
- Support to the Establishment of the EIONET for Monitoring and Reporting System
- Support to the Establishment of the EIONET for Monitoring and Reporting System
- Technical Assistance to Project Preparation for Environment and Climate Change
- P510187- Waste Management Reform Project - Procurement Plan (Ministry of Finance-Technical Service Unit)
- Consultant to for Local Waste Management Plan
- Consultant to for Local Waste Management Plan
- Consultant to for Local Waste Management Plan
