Construction of Rize Wastewater Collection System (Lot 2) - Completion Works
One of 637 tenders Taiyo tracks in Türkiye.
Source: TED Europa
The scope of work is summarized as bellow: a) Construction of approximately 3.039 km wastewater collector pipeline, including ground improvement works, b) Construction of approximately 30 m Special Crossing of river by pipejacking and/or horizontal drilling wastewater collector pipeline, c) Construction of 3 prefabricated GRP (Glass Reinforced Plastic) Package Type Wastewater Pumping Station (Bağd
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Waste Processing and Treatment
- Location
- Turkey
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Construction of Rize Wastewater Collection System (Lot 2) - Completion Works
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The scope of work is summarized as bellow: a) Construction of approximately 3.039 km wastewater collector pipeline, including ground improvement works, b) Construction of approximately 30 m Special Crossing of river by pipejacking and/or horizontal drilling wastewater collector pipeline, c) Construction of 3 prefabricated GRP (Glass Reinforced Plastic) Package Type Wastewater Pumping Station (Bağdatlı, Çiftekavak and Hal) d) Approximately 12 m forced mains and associated structures, e) Construction of approximately 87 manholes, including relevant ground improvement works f) Installation of complementary SCADA System which is composed of operator workstation system, SCADA software and licences, other relevant software and licences, and system accessories g) Preparation of wastewater collection system network as-built plans for constructed sewer mains, h) Complementary works and documentation, including: 1. CCTV inspection for approximately 6,920 m installed pipes, 2. Leakage test for approximately 963 m installed pipes, 3. Leakage test for approximately 44 manholes, 4. Completion of non-completed bridge crossing works, 5. Correction of non-conformities, 6. Provision of Certificate of Origin in accordance with Sub-Clause 7.9, 7. Preparation and submission of as-built plans for completed works. The design for the wastewater collection system involves, in most cases, the complete replacement of the existing pipelines. As these existing pipelines are “live” the Contractor shall need to carefully plan the works to maintain wastewater collection services to customers as much as possible. This issue shall be valid for all “live” wastewater pumping stations. During this planning, the service continuity should be in the first priority. System temporary rearrangements to be done for service continuity shall be taking into consideration during pricing. In wastewater collection system, package wastewater pumping station shall be supplied and installed during the construction of new one. These facilities shall be in operation until the final acceptance. |
Original sector | Construction work |
Location
Country | Turkey |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Bridge, Waste Processing and Treatment |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Türkiye
- Additional WASH Rehabilitation Project in Islahiye / Gaziantep
- Balıkesir Water and Sewerage Administration (BASKİ) Procurement of High Suction Sewer Opening and Cleaning Vehicle
- Türkiye Flood and Drought Management Project: Preparation of Resettlement Plan and Monitoring & Evaluation Reports for the Construction of Permeable Check Dams in Samsun Province
- Turkey Climate Smart and Competitive Agricultural Growth Project (TUCSAP): Construction work for the TUCSAP International Agricultural Research and Training Center Directorate (UTAEM) Menemen-Izmir Irrigation Technologies R&D Innovation Center (Su-TEAM)
- EQR Malatya Water and Wastewater Network Rehabilitation: Rehabilitation and construction works of Malatya’s water supply, wastewater and stormwater networks, and ancillary facilities including associated construction supervision services
- EQR: Osmaniye Wastewater Treatment: Project Monitoring And Implementation Support
- Municipal Services Improvement Project: KMARAS2-G1: Procurement of Goods and Equipment - 1 Lot 1: 3 Nos of combined sewer cleaning vehicles, Lot 2: 2 Nos of excavators & 3 Nos of backhoe loaders,Lot 3: 4 Nos of backhoe loaders
- Construction of Tekebaşı Wastewater Treatment Plant
