Construction of Rustavi-Algeti (Lot I) and Algeti-Red Bridge (Lot II)
Sector: Bridge • Location: Luxembourg
Source: European Investment Bank (EIB)
The Contracting Authority will adopt an international competitive bidding process, also known as the open procedure, for this contract, as outlined in the EIB’s Guide to Procurement (July 2024). This procedure will be carried out according to the July 2024 version of the EIB’s Guide to Procurement, in compliance with national laws. The process employs a single-stage, two-envelope system and is ope
- Status
- Prospective
- Sector
- Bridge
- Location
- Luxembourg
- Updated
- 3 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about Construction of Rustavi-Algeti (Lot I) and Algeti-Red Bridge (Lot II)
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | on going |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contracting Authority will adopt an international competitive bidding process, also known as the open procedure, for this contract, as outlined in the EIB’s Guide to Procurement (July 2024). This procedure will be carried out according to the July 2024 version of the EIB’s Guide to Procurement, in compliance with national laws. The process employs a single-stage, two-envelope system and is open to all bidders from eligible countries specified in the Bidding Document. The bidding process adheres to principles of open international competition, non-discrimination, fairness, transparency, and aims to select the most economically advantageous offer. Bidders shall submit two separate envelopes simultaneously: one containing the Technical Bid and the other containing the Price Bid. Both envelopes shall be enclosed within a single outer envelope. The Employer shall publicly open the Technical Bids at the address, date, and time specified in the Bidding Document. The Technical Bids shall then be evaluated in accordance with the provisions of the Bidding Documents. The Price Bids will remain unopened and will be held in custody of the Employer until the specified time of their opening. At the end of the evaluation of the Technical Bids, the Employer will invite bidders who have submitted substantially responsive Technical Bids to attend the opening of the Price Bids. The date, time, and location of the opening of Price Bids will be advised in writing by the Employer. |
Location
Country | Luxembourg |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Tender |
Sector | Bridge |
Article published date | 2026-07-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in Luxembourg
- Réalisation d’un passage à faune mixte en remplacement de l’OA1009 sur l’A6
- Appel d'offres portant sur le déploiement national de plaquettes physiques d'information aux arrêts d'autobus
- Mise à 2x2 voies de la B7 entre le Viaduc Colmar-Berg et Ettelbruck – Lot 1 OA 1502 : Doublement du Viaduc de Schieren
- Gare de Luxembourg, remaniement caténaires de la partie tête-ouest - phase candidature
- CONTRAT CADRE : Amélioration de la couverture en réseaux mobiles le long des voies : Réalisation de plans de principe et demandes administratives pour construction de mâts de Télécommunication - Phase candidatures
- CORRIGENDUM FOR EXTENSION OF DEADLINE FOR SUBMISSION - CONSULTANCY SERVICES FOR THE SUPERVISION OF CONSTRUCTION WORKS FOR RUSTAVI-ALGETI (LOT I) AND ALGETI-RED BRIDGE (LOT II)
- Lao Resilient Roads Framework Loan – National Road No. 13 South Project
- India-Nagpur- Design, Supply, Installation, Testing and Commissioning of Ballastless track for elevated viaduct of Reach 1B & Reach 3A of NMRP Phase-2
