TenderClosed
Construction of the Permanent Connection to the Existing Deep Tunnel Sewerage System (DTSS) at East Coast
The scope, dates and status of this tender. A free account opens every field.
Source: Singapore's National Water Agency
- Status
- Closed
- Sector
- Tunnel, Water Supply and Storage, Waste Processing and Treatment
- Location
- Singapore
- Updated
- 22 Jul 2026
- Source
- Singapore's National Water Agency
ConstructChat
Ask ConstructChat about Construction of the Permanent Connection to the Existing Deep Tunnel Sewerage System (DTSS) at East Coast
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Tender Information FAQ
Tender Information
3 Q
Participants
| Not available for this record. |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
| Not available for this record. |
Location
Country | Singapore |
Source
Source | Singapore's National Water Agency |
URL |
More Details
Record type | Tender |
Sector | Tunnel, Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Tunnel tenders in Singapore
- DESIGN AND CONSTRUCTION OF A 6M DIAMETER TUNNEL WITH TWIN 2200MM AND 1200MM DIAMETER WATER PIPELINES FROM PROPOSED TUAS WATER RECLAMATION PLANT TO JURONG ISLAND – CONTRACT 1
- Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-09
- Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-11
- Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-10
- Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-08
- Design and Construction of Sewer Tunnels for the Deep Tunnel Sewerage System Phase 2 Project – Contract T-07
- Pre-Qualification (Round 1) of Early Contractor Involvement (ECI) for Proposed Deep Tunnel Sewerage System (DTSS) Bypass at Sungei Bedok
- Repair, Maintenance and Associated Civil Works for Used Water Pumping Mains and DTSS Tunnel Shafts for 2026-2029
