Construction of Water Supply Network with Water Reservoir
Active · Afghanistan · Last reported Dec 2025
Source: United Nations Global Marketplace (UNGM)
SECTION 1: REQUEST FOR QUOTATION (RFQ)UNDP kindly requests your quotation for theUNDP-AFG-00759:Construction of Water Supply Network with Water Reservoir in 2 Different Location of Samangan ProvinceLocation #1: Water Supply Network and Construction of 40m3 Water Reservoir for Mula Sultan Village Khulm District, Samangan ProvinceLocation #2: Water Supply Network and Construction 30m3 Water Reservoi
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Afghanistan
- Updated
- 3 Nov 2026
- Source
- United Nations Global Marketplace (UNGM)
ConstructChat
Ask ConstructChat about Construction of Water Supply Network with Water Reservoir
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SECTION 1: REQUEST FOR QUOTATION (RFQ)UNDP kindly requests your quotation for theUNDP-AFG-00759:Construction of Water Supply Network with Water Reservoir in 2 Different Location of Samangan ProvinceLocation #1: Water Supply Network and Construction of 40m3 Water Reservoir for Mula Sultan Village Khulm District, Samangan ProvinceLocation #2: Water Supply Network and Construction 30m3 Water Reservoir for Nawabad Tolagachi Village, FerozNakhchir District, Samangan ProvinceThis Request for Quotation comprises the following documents:Section 1: This RFQ document generated by the online system.Section 2: RFQ Instructions and DataAnnex 1: Schedule of RequirementsAnnex 1.1 Scope of worksAnnex 1.2 Technical DrawingsAnnex 1.3 BoQAnnex 1.4 Work planAnnex 1.5Occupational and Safety plan OHS standard templateAnnex 1.6 ABADEI Cash for Work SOPAnnex 1.7 Gender Action PlanAnnex 1.8 SESPAnnex 2: Quotation Submission FormAnnex 3: Technical and Financial OfferAnnex 4: Performance Security Form (Form A)Annex 5: Counter party informationWhen preparing your quotation, please be guided bythe RFQ Instructions and Data. Please note that quotations must be submitted directly in the system responding to the questions and uploading required documents. by the date and time indicated in the online portal. It is your responsibility to ensure that your quotation is submitted before the deadline. Quotations received after the submission deadline outside the online portal, for whatever reason, will not be considered for evaluation.Quotations must be submitted directly in NextGenERP supplier portal following this link:http://supplier.quantum.partneragencies.orgusing the profile you may have in the portal.Follow the instructions in the user guide to search for the tender using Negotiation ID in this document.In case you have never registered before, follow this link to register a profile:https://estm.fa.em2.oraclecloud.com/fscmUI/redwood/supplier-registration/register-supplier/register-supplier verification?id=TUW16eK6qcr65MdIwwPNMoYCOHny7FmchTkUHQSQj2Zd57rfTCL98StNsw%3D%3DDo not create a new profile if you already have one. Use the forgotten password feature in case you do not remember the password or the username from previous registration.Thank you and we look forward to receiving your quotations.Procurement Unit |
Original sector | Engineering and Research and Technology Based Services |
Location
Country | Afghanistan |
Source
Source | United Nations Global Marketplace (UNGM) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2025-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Afghanistan
- Construction of Quzi Village S Solar Powered Pipe Scheme Project in Khan Abad District of Kunduz
- 146/UK: W 2.4 RBPS: Rehabilitation of Lechilam Riverbank Protection Scheme in Dara-E-Pech District of Kunar Province in the East/Jalalabad Region
- W 2.7 RBPS: Rehabilitation of Zerani Riverbank Protection Scheme in Qarghaee District of Laghman Province in the East/Jalalabad Region
- Request for Quotations for Renovation of Ghandak BHC
- Afghanistan ITT-AFG-KBL-2026-PR691487 Construction of 6 new Water supply systems and Rehabilitation of 8 Water Points- Wardak Province
- Rehabilition of Solar Power Water Supply Scheme
- Construction of Solar Powered Pipe Scheme Project, in Adinwal and Khan Gala villages in Gomal
- Construction of Pipe Scheme with a Solar pump system in Ashoor Bic Khill village in Jabalusaraj District of Parwan Province
