Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
Contract award notice · Ireland · Last reported Oct 2026
Source: TED Europa
Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
- Status
- Closed
- Sector
- Residential, Road, Commercial
- Location
- Ireland
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Construction Programme Analyst for proposed 14 storey Office Building at Bank Place, Opera Square, Limerick |
Original sector | Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services |
Budget |
Location
Country | Ireland |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Residential, Road, Commercial |
Article published date | 2026-10-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Residential tenders in Ireland
- Supply of Branded Stationery and Merchandise - Ireland’s Presidency of the Council of the European Union 2026
- Furniture
- Project Management Services For Apartment Defects Remediation
- Provision of SPSV Driver Entry Test Review
- 2930 - Hacketstown Fire Safety Training Tower and Boundary Fence
- Software Architecture, Design and Test services for the design and implementation of a novel, research-grade yet production-capable digital health platform
- Call for Tenders under the Provision of School Meals Scheme Naíscoil Ide 17978v
- Call for Tender for the Provision of Reporting and Analysis of European Aquaculture Consenting Processes
