logo

Construction Services Of A Power Generation Microgrid At Cape Cod Space Force Station In Bourne, Ma

Sector: Wind • Location: Bourne, Massachusetts, United States of America

Source: SAM.gov

Tender
Solicitation

Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with mini

Status
Closed
Sector
Wind, Government, Aerospace & Defense, Energy Storage, Power Generation (CCGT), Commercial, Residential
Location
Bourne, Massachusetts, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Construction Services Of A Power Generation Microgrid At Cape Cod Space Force Station In Bourne, Ma

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Construction Services Of A Power Generation Microgrid At Cape Cod Space Force Station In Bourne, Ma” is a tender record in Taiyo, linked to the Wind sector. It is issued for works, goods, or services related to Bourne, Massachusetts, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with minimal dis?ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en?ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa?cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con?trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera?tors, uninterrupted power supplies, critical and non-critical power distribution re?sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis?sion critical operations and impacted pro?tective HEMP barriers.

Original sector

Construction

Location

Country

United States of America (USA)

State

Massachusetts

City

Bourne

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Wind, Government, Aerospace & Defense, Energy Storage, Power Generation (CCGT), Commercial, Residential

Article published date

2026-03-04

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender