logo

Contract OB1 - Water and Sewage installations (sea and land) in the project Transfer Facility.

One of 10,000+ tenders Taiyo tracks in Norway.

Source: TED Europa

Tender
Contract Award Notice

MOVAR shall expand Fuglevik treatment facility (RA) capacity wise for the future, and to include sewage water that is now cleaned at Kambo RA, which shall be reconstructed to a pre-treatment facility and pump station. MOVAR received a new discharge licence from the Manager in Oslo and Viken, where, from 2026, there will be a requirement for reduction of both phosphor, nitrogen and organic matter.

Status
Closed
Sector
Road, Water Supply and Storage, Fertilizers, Rail, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial)
Location
Norway
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about Contract OB1 - Water and Sewage installations (sea and land) in the project Transfer Facility.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “Contract OB1 - Water and Sewage installations (sea and land) in the project Transfer Facility.” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Norway.

Participants

Not available for this record.

Status

Original status

contract award notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

MOVAR shall expand Fuglevik treatment facility (RA) capacity wise for the future, and to include sewage water that is now cleaned at Kambo RA, which shall be reconstructed to a pre-treatment facility and pump station. MOVAR received a new discharge licence from the Manager in Oslo and Viken, where, from 2026, there will be a requirement for reduction of both phosphor, nitrogen and organic matter. The project is referred to as "Cleaner Oslofjord", and is again divided into two sub-projects «Nye Fuglevik Renseanlegg» and «Overføringsanlegg». The part-project «Overføringsanlegget» comprises laying an approx. 15 km long sewage pipeline from Brevik via Kambo and to Fuglevik Treatment Facility. This sea and land pipeline will run in Mossesundet, cross the infrastructure between Moss and Jeløy, and continue out in Værlebukta to Fuglevik RA. It also includes alterations to the current treatment facility at Kambo to a pump station, a new pump station at Brevik and renovation of Møllebakken pump station. This procurement, OB1 – Water and Sewage installations (sea and land) is one of three planned contracts in the sub-project 'The Transfer Facility', and is an execution contract in accordance with NS8405. It mainly applies to laying a transmission pipeline for sewage in the stretch Brevik – Kambo – Fuglevik, in addition an emission pipeline from the existing discharge foam by the beach at Fuglevik and out to 50 m water depths shall be laid. The total route of approx. 14,800 m is divided into seven areas. It is estimated that the construction period will be approx. 32 months, so that the binding, daily final deadline is 02.06.2028.

Original sector

Construction structures and materials; auxiliary products to construction (except electric apparatus), Construction structures and materials; auxiliary products to construction (except electric apparatus), Construction structures and materials; auxiliary products to construction (except electric apparatus), Construction structures and materials; auxiliary products to construction (except electric apparatus), Construction structures and materials; auxiliary products to construction (except electric apparatus), Industrial machinery, Construction work, Construction work, Construction structures and materials; auxiliary products to construction (except electric apparatus), Construction work, Construction work, Industrial machinery, Construction work

Budget

Location

Country

Norway

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Fertilizers, Rail, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial)

Article published date

2026-03-07

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender