Coolidge Pool Opening and Winterizing
The scope, dates and status of this tender. A free account opens every field.
Source: Massachusetts Purchasing Group
Under the direction of the Director of Parks and Recreation , the Contractor shall provide all labor , materials , and supervision necessary to prepare , commission , and winterize the Robert J . Crowley Pool . The primary objective is to ensure the facility is fully operational and in strict compliance with Massa
- Status
- Closed
- Sector
- Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial)
- Location
- Massachusetts, United States of America
- Updated
- 3 Nov 2026
- Source
- Massachusetts Purchasing Group
ConstructChat
Ask ConstructChat about Coolidge Pool Opening and Winterizing
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Under the direction of the Director of Parks and Recreation , the Contractor shall provide all labor , materials , and supervision necessary to prepare , commission , and winterize the Robert J . Crowley Pool . The primary objective is to ensure the facility is fully operational and in strict compliance with Massachusetts Regulations ( 105 CMR 435 ) and local Board of Health requirements . 2 . Scope of Services A . Mechanical Systems & Equipment Startup • System Inspection : Inspect and initiate pumps , motors , filtration systems , and backwash units . • Operational Verification : Confirm the system achieves the required turnover rate . • Flow Monitoring : Ensure all flow meters are present , operational , and calibrated . • Continuous Operation : Confirm and monitor continuous filtration system performance . B . Water Treatment & Chemical Balancing The contractor is responsible for filling the pool and achieving the following parameters per MA code : • Disinfection : Initial shock chlorination ; maintain Free Chlorine at 1 . 0 – 3 . 0 ppm . • Balance : pH between 7 . 2 – 7 . 8 ; Alkalinity and Calcium Hardness within industry standards . • Stabilization : Maintain stabilizer levels within acceptable limits . • Automation : Verify that all automatic chemical feeders and controllers are fully operational . C . Operational Testing • Stress Test : Run the full system continuously for a minimum of 24 – 48 hours . • Validation : Monitor for leaks , mechanical failures , and chemical feed accuracy during the test period . D . Winterization of Pool and Kiddie Pool - Performed by a certified pool operator ( CPO ). The closing includes : • Drain residual water ( 2 inches or less ) from the pool after the owner has drained the main body of water . • Remove any fittings and install winter plugs in drains and returns as needed • Blow out the lines , piping , and equipment with compressed air to remove residual water . • Install antifreeze in lines and equipment to mitigate freezing . • Winterize all filtration equipment . • Remove chemical probes and sensors and deliver them to the owner for warm winter storage . 3 . Compliance & Documentation The Contractor shall facilitate the local Board of Health inspection by providing : 1 . Water Chemistry Logs : Detailed records of initial and stabilized levels 2 . Equipment Verification : Written proof of mechanical system integrity . 3 . Permit Support : On - site support for health department walkthroughs . |
Location
Country | United States of America (USA) |
State | Massachusetts |
Source
Source | Massachusetts Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
