Court Seats Alabaster Rec Center
Location: Alabama, United States of America
Source: Alabama Purchasing Group
a . General Description : i . Basis of Design : Spec Seats DS - 100 or Equivalent ii . Shipping , Unloading , Installation , and storage carts 1 . Please include shipping , unloading , and installation of the supplied fitness equipment package . Unloading shall be included in the proposal . b . Base Proposal i . Proposal shal
- Status
- Closed
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about Court Seats Alabaster Rec Center
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | a . General Description : i . Basis of Design : Spec Seats DS - 100 or Equivalent ii . Shipping , Unloading , Installation , and storage carts 1 . Please include shipping , unloading , and installation of the supplied fitness equipment package . Unloading shall be included in the proposal . b . Base Proposal i . Proposal shall include shipping , unloading , and installation of the supplied package . All quantities can be found on the bid tabulation form . 1 . ( 90 ) individual padded court seats with two color options ( Frame / Pad ). Please include all necessary storage carts in your proposal . The proposal should include materials , shipping , unloading and installation . c . General Items i . The proposal shall include all applicable permits , licenses , etc related to this work of scope ii . The proposal shall include all necessary hoisting , rigging , scaffolding , staging , temporary safety protection , material hoisting , equipment , and small tools necessary to perform the referenced scope of work . All equipment to meet OSHA standards iii . Proposal to include clean - up of all trash and debris . iv . Proposal to include all blocking , backing , and supports , necessary v . The warranty period for all material , equipment , and labor based on specifications shall commence at the date of substantial completion vi . Include all engineering and surveying required to perform work unless noted otherwise vii . Coordination and meetings as required by the site ’ s general contractor or SFM viii . Proposal shall include Safety meeting attendance as required by site conditions ix . Provide safety manual and site specific plan upon request x . Conform to all applicable codes and regulations xi . Proposal shall include any storage requirements for material on site to complete work xii . Proposal shall include necessary mobilizations required for scope of work xiii . Any field verification required d . Schedule : Installation in Q4 of 2026 e . Dumpster provided by : Contractor f . Prevailing Wages ( Y / N ) No g . Tax Exempt ( Y / N ) Yes h . Liquidated Damages ( Y / N ) Yes – 15 % |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
