COVB-24-101314 New Colony Dr â Old Providence Rd Backyard Sewer Replacement
Source: City of Virginia Beach
The work includes furnishing all equipment, labor, and materials for the demolition and replacement of 1,248 linear feet of existing 8-inch vitrified clay gravity sewer located in the backyard of single family and multi-family residential homes and within an existing utility easement. The work will also include, but is not limited to, erosion and sediment control measures, traffic control, pre-con
Tender Information FAQ
Tender Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | open |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work includes furnishing all equipment, labor, and materials for the demolition and replacement of 1,248 linear feet of existing 8-inch vitrified clay gravity sewer located in the backyard of single family and multi-family residential homes and within an existing utility easement. The work will also include, but is not limited to, erosion and sediment control measures, traffic control, pre-construction and post-construction CCTV of all stormwater piping within the limits of disturbance, demolition of designated fencing and landscaping features within the designated easements, temporary and/or permanent relocation of existing privately owned storage sheds, establishment of temporary construction fencing along the limits of disturbance to provide for a physical and visual barrier between private property and the construction area, demolition of the existing 8-inch gravity sewer piping and manholes, bypass pumping to maintain sewer service, construction of 1,248 linear feet of new 8-inch ductile iron gravity sewer and manholes, trench bedding and backfill, post-construction CCTV on newly installed gravity sewer, site grading to establish positive drainage, replacement of designated concrete sidewalk and curb,construction of 2,620 linear feet of new privacy fencing and gates of wood construction, site restoration to pre-construction conditions, and all incidental work thereto as required in the Contract Documents |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
