Cragfont Dry Stack Stone Wall Repair & Restoration
Sector: Commercial • Location: Tennessee, United States of America
Source: Tennessee Purchasing Group
This scope of work will focus on repairing and restoring approximately two thousand two hundred ( 2 , 200 ) square feet ( six hundred ( 600 ) feet in length ) dry stack stone wall at Cragfont State Historic Site . The goal is to restore , repair , and reconstruct the wall across the entire length of the struct
- Status
- Closed
- Sector
- Commercial, Cement, Residential
- Location
- Tennessee, United States of America
- Updated
- 3 Nov 2026
- Source
- Tennessee Purchasing Group
ConstructChat
Ask ConstructChat about Cragfont Dry Stack Stone Wall Repair & Restoration
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This scope of work will focus on repairing and restoring approximately two thousand two hundred ( 2 , 200 ) square feet ( six hundred ( 600 ) feet in length ) dry stack stone wall at Cragfont State Historic Site . The goal is to restore , repair , and reconstruct the wall across the entire length of the structure to an average height of three and one half ( 3 . 5 ) feet , including the copestones . Contractor shall do all the following without exception : 1 . Initial Assessment and Documentation : • Perform a thorough evaluation of the dry stack stone wall to determine and document all existing conditions , necessary repairs , and specific restoration requirements for the sashes , frames , and associated millwork . • Photograph the stone wall in a manner to assist with reconstruction . 2 . Careful Disassembly : • In fifty ( 50 ) foot sections at a time , dismantle the stonework of the wall . • After dismantling each section , remove all Portland cement or other modern materials used to temporarily repair sections of the wall in the past . • Evaluate available stone to reuse and document where additional will be needed to replace cracked and unusable stones . 3 . Reconstructing the dry stack stone wall • Using the photographic evidence required in the documentation phase , reconstruct the dry stack stone wall in fifty ( 50 ) foot sections based on the design and layout of how it was previously constructed , including the copestones . • The reconstruction process shall use all salvageable stones from the original wall first . - Contractor is responsible for sourcing all additional stone required to reconstruct the wall . This price shall be included in the quote and an approval by site director and program coordinator is required before agreeing on new stone being suggested . - Slight changes to the original design are permitted based on stones available , trees surrounding the wall , gates , and the new request to adhere to a three and one half ( 3 . 5 ) foot height across the length of the wall . Significant changes are required to be brought to program coordinator and site director for approval ... |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | Tennessee Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Commercial, Cement, Residential |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
