Crg Pace Heater Sources Sought
Sector: Power Generation (CCGT) • Location: Joint Base MDL, New Jersey, United States of America
Source: SAM.gov
- General: The CRG requires rapid deployment capabilities across the globe with equipment suitable for sustainment of operations. Current assets do not meet arctic and sub-arctic requirements for reliant heating for personnel and equipment in the field. UTS is the sole provider for a heating solution feasible for a light and lean approach. Through procurement of 14 UTS HH75 Heaters, it will satis
- Status
- Prospective
- Sector
- Power Generation (CCGT), Aerospace & Defense, Government
- Location
- Joint Base MDL, New Jersey, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Crg Pace Heater Sources Sought
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | special notice |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1. General: The CRG requires rapid deployment capabilities across the globe with equipment suitable for sustainment of operations. Current assets do not meet arctic and sub-arctic requirements for reliant heating for personnel and equipment in the field. UTS is the sole provider for a heating solution feasible for a light and lean approach. Through procurement of 14 UTS HH75 Heaters, it will satisfy the gap we face for locations reaching below -10°F and reinforce our global prowess. 2. Objectives: The 621 CRG needs a capability that enables its force elements to operate in any AOR, including arctic and sub-arctic conditions while remaining light, lean, and agile; the UTS HH75 Heater is essential to this capability since it outperforms the current heating capability of the Environmental Control Unit (ECU). The UTS 5-ton Environmental Control Unit (ECU) meets most theater requirements for operating limitations. The main limitation is ambient operating temperatures of -25 to 125°F. To meet arctic and sub-arctic conditions the need for the UTS HH75 Heater is paramount. The Heater is multi-fueled (DF1, DF2, JP5, JP8, Kerosene). Ambient operating temperature is based off the fuel utilized. Kerosene used as fuel for the Heater opens the door to temperatures as low as -50°F. In colder environments, the ECU will push at most, 12Kw (40,000 BTU/hr) of heat. The 12Kw also translates to load on the generator which increases fuel consumption dramatically. Dependent on set-up, the generator would utilize about 4 gal an hour due to the ECUs maxing out. The UTS HH75 Heater would pull only 3Amps for the electronic controls and mainly rely on its 11.6gal fuel tank. Under continuous use, it would pull .53 gal per hour. A full tank would sustain heating needs for 22 hours. 3. Scope of Work: This equipment will be used for the 621st Contingency Response Wing 621 CRW operations, on base and various locations for deployments, training, and exercises. The vendor will provide and deliver the equipment with standard manufacturer warranty to meet global availability for contingency forces to include arctic and sub-arctic regions. The 621 CRW will be responsible for maintaining the accountability and maintenance of the equipment past the warranty period. 4. Personnel: The vendor will provide delivery of this item. The maintenance, accountability, and operations of this equipment will be the responsibility of the CRG AGE/Electrical Power Production Work Center. 5. Equipment Requirements and peripheral shall meet or exceed the specs of: Heat Output: 75,000 BTU/H Dimensions: 44.0” L x 16.4” W x 25.0” H Tank Capacity: 11.6 Gallons Fuel Consumption under Continuous Use: 0.53 gallons per hour Fuel Requirements: DF1, DF2, JP5, JP8, and Kerosene Power Requirements: 120 VAC, 60 Hz, Single Phase Power Usage: 3 Amps @120V Accessories Included: Exhaust Stack, Heater Ducts (2), Remote Thermostat, O&M Manual |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Joint Base MDL |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Aerospace & Defense, Government |
Article published date | 2026-06-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
