logo

Critical Repair Program - 1563 Robert E Lee St . - Roof Replacement

The scope, dates and status of this tender. A free account opens every field.

Source: Alabama Purchasing Group

Tender
Closed

o Areas that are found to be spaced decked shall be covered with ½ ” exterior grade sheathing material after removing the existing decking . It is the contractors responsibility to ensure the framing and structure will support the additional load . o Remove existing roofing materials down to bare decking .

Status
Closed
Location
Alabama, United States of America
Updated
3 Nov 2026
Source
Alabama Purchasing Group

ConstructChat

Ask ConstructChat about Critical Repair Program - 1563 Robert E Lee St . - Roof Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Critical Repair Program - 1563 Robert E Lee St . - Roof Replacement” is a tender record in Taiyo. It is issued for works, goods, or services related to Alabama, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

o Areas that are found to be spaced decked shall be covered with ½ ” exterior grade sheathing material after removing the existing decking . It is the contractors responsibility to ensure the framing and structure will support the additional load . o Remove existing roofing materials down to bare decking . o Check all roof trusses / rafters and repair / replace as needed to ensure that new roof structure is flat and smooth without rises or depressions in roof system . o Replace all rotten , broken , un - even , weak , or deteriorated decking framing ; including supporting roofing system such as rafter tails , facia and etc . o Any exposed repaired or replace wood should be protected from the elements , painted to match existing color . o Replaced / repaired decking shall be level and ready to accept felt and shingles . o Check all roof trusses for strength and stability before re - shingling house . o Remove all unused elements , vents , etc ., that are not operational and close them below roof level . o Re - flash all valleys , vents , roof openings , and chimneys .

Location

Country

United States of America (USA)

State

Alabama

Source

Source

Alabama Purchasing Group

URL

More Details

Record type

Tender

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender