logo

CSBCC Teaching Pool Re - Plastering & Lap Pool Acid Wash Project

Bids closed Apr 2026 · New Hampshire · Last reported Mar 2026

Source: New Hampshire Purchasing Group

Tender
Closed

Scope of Work : Claremont Savings Bank Community Center ( CSBCC ) Teaching Pool Re - Plastering & Lap Pool Acid Wash Project I . Teaching Pool – Re - Plastering Project The contractor shall provide all labor , materials , equipment , supervision , and operational support necessary to complete the following work : 1 . Pool Dr

Status
Closed
Sector
Water Supply and Storage, Education
Location
New Hampshire, United States of America
Updated
3 Nov 2026
Source
New Hampshire Purchasing Group

ConstructChat

Ask ConstructChat about CSBCC Teaching Pool Re - Plastering & Lap Pool Acid Wash Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “CSBCC Teaching Pool Re - Plastering & Lap Pool Acid Wash Project” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to New Hampshire, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Scope of Work : Claremont Savings Bank Community Center ( CSBCC ) Teaching Pool Re - Plastering & Lap Pool Acid Wash Project I . Teaching Pool – Re - Plastering Project The contractor shall provide all labor , materials , equipment , supervision , and operational support necessary to complete the following work : 1 . Pool Draining and Refilling • The contractor shall be responsible for the complete draining of the teaching pool prior to the start of work . • Upon completion of all plastering and installation work , the contractor shall be responsible for refilling the teaching pool and coordinating the initial water fill process in accordance with industry standards to protect the new finish . 2 . Surface Preparation • Prepare the existing teaching pool interior to properly accept a new surface finish . • Perform a complete acid wash of the teaching pool interior to clean and etch the existing surface . 3 . Subsurface Bonding • Supply and install a multicoat scratch kote subsurface to the entire teaching pool interior . • Multicoat shall function as a bonding agent to enhance adhesion between the existing surface and the new finish . • Multicoat applications shall include coverage over existing step tile in preparation for new step tile installation . 4 . Tile Installation • Supply and install new 4 - inch ceramic tile banding on each step within the teaching pool . 5 . Pool Finish • Option # 1 : Replaster the teaching pool with a standard white interior finish . • Option # 2 : Resurface the teaching pool with Luna Quartz – Martinique finish . 6 . Main Drains • Supply and install two ( 2 ) new anti - entrapment compliant main drain frames and grates in the teaching pool meeting current safety standards . 7 . Startup & Commissioning • Perform initial startup procedures once the pool is refilled . • Provide instruction to Community Center staff on the care and maintenance of the new pool surface and equipment . • Initial startup and initial water balancing chemicals shall be included . 8 . Owner Responsibilities • CSBCC staff shall be responsible for brushing the pool surface and testing water chemistry for the first ten ( 10 ) days following startup . II . Lap Pool – Acid Wash Project The contractor shall provide all labor , materials , equipment , supervision , and operational support necessary to complete the following work : 1 . Pool Draining and Refilling • The contractor shall be responsible for draining the lap pool prior to the start of the acid wash process . • Upon completion of all work , the contractor shall be responsible for refilling the lap pool and assisting with the startup process . 2 . Cleaning & Surface Treatment • Perform a complete acid wash and pressure wash of the lap pool interior . • Sand rough surface areas as necessary , not to exceed 300 square feet . 3 . Startup & Water Balancing • Perform initial startup procedures after the pool has been refilled . • Initial startup and initial water balancing chemicals shall be included . III . General Conditions • All work shall comply with applicable state and local codes , industry standards , and manufacturer specifications . • Contractor shall coordinate work schedules with CSBCC staff to minimize disruption to facility operations . • Contractor shall maintain a safe and clean work environment throughout the duration of the project . • Contractor shall ensure that all draining and refilling operations are conducted in accordance with environmental regulations and facility plumbing capacities

Location

Country

United States of America (USA)

State

New Hampshire

Source

Source

New Hampshire Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Education

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender