CSBCC Teaching Pool Re - Plastering & Lap Pool Acid Wash Project
Bids closed Apr 2026 · New Hampshire · Last reported Mar 2026
Source: New Hampshire Purchasing Group
Scope of Work : Claremont Savings Bank Community Center ( CSBCC ) Teaching Pool Re - Plastering & Lap Pool Acid Wash Project I . Teaching Pool – Re - Plastering Project The contractor shall provide all labor , materials , equipment , supervision , and operational support necessary to complete the following work : 1 . Pool Dr
- Status
- Closed
- Sector
- Water Supply and Storage, Education
- Location
- New Hampshire, United States of America
- Updated
- 3 Nov 2026
- Source
- New Hampshire Purchasing Group
ConstructChat
Ask ConstructChat about CSBCC Teaching Pool Re - Plastering & Lap Pool Acid Wash Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Scope of Work : Claremont Savings Bank Community Center ( CSBCC ) Teaching Pool Re - Plastering & Lap Pool Acid Wash Project I . Teaching Pool – Re - Plastering Project The contractor shall provide all labor , materials , equipment , supervision , and operational support necessary to complete the following work : 1 . Pool Draining and Refilling • The contractor shall be responsible for the complete draining of the teaching pool prior to the start of work . • Upon completion of all plastering and installation work , the contractor shall be responsible for refilling the teaching pool and coordinating the initial water fill process in accordance with industry standards to protect the new finish . 2 . Surface Preparation • Prepare the existing teaching pool interior to properly accept a new surface finish . • Perform a complete acid wash of the teaching pool interior to clean and etch the existing surface . 3 . Subsurface Bonding • Supply and install a multicoat scratch kote subsurface to the entire teaching pool interior . • Multicoat shall function as a bonding agent to enhance adhesion between the existing surface and the new finish . • Multicoat applications shall include coverage over existing step tile in preparation for new step tile installation . 4 . Tile Installation • Supply and install new 4 - inch ceramic tile banding on each step within the teaching pool . 5 . Pool Finish • Option # 1 : Replaster the teaching pool with a standard white interior finish . • Option # 2 : Resurface the teaching pool with Luna Quartz – Martinique finish . 6 . Main Drains • Supply and install two ( 2 ) new anti - entrapment compliant main drain frames and grates in the teaching pool meeting current safety standards . 7 . Startup & Commissioning • Perform initial startup procedures once the pool is refilled . • Provide instruction to Community Center staff on the care and maintenance of the new pool surface and equipment . • Initial startup and initial water balancing chemicals shall be included . 8 . Owner Responsibilities • CSBCC staff shall be responsible for brushing the pool surface and testing water chemistry for the first ten ( 10 ) days following startup . II . Lap Pool – Acid Wash Project The contractor shall provide all labor , materials , equipment , supervision , and operational support necessary to complete the following work : 1 . Pool Draining and Refilling • The contractor shall be responsible for draining the lap pool prior to the start of the acid wash process . • Upon completion of all work , the contractor shall be responsible for refilling the lap pool and assisting with the startup process . 2 . Cleaning & Surface Treatment • Perform a complete acid wash and pressure wash of the lap pool interior . • Sand rough surface areas as necessary , not to exceed 300 square feet . 3 . Startup & Water Balancing • Perform initial startup procedures after the pool has been refilled . • Initial startup and initial water balancing chemicals shall be included . III . General Conditions • All work shall comply with applicable state and local codes , industry standards , and manufacturer specifications . • Contractor shall coordinate work schedules with CSBCC staff to minimize disruption to facility operations . • Contractor shall maintain a safe and clean work environment throughout the duration of the project . • Contractor shall ensure that all draining and refilling operations are conducted in accordance with environmental regulations and facility plumbing capacities |
Location
Country | United States of America (USA) |
State | New Hampshire |
Source
Source | New Hampshire Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Education |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements