CSU - Termite Treatment and Bond Services
One of 10,000+ tenders Taiyo tracks in Georgia.
Source: Georgia Purchasing Group
1 . The Contractor shall apply treatment methods in accordance with industry best practices and product label requirements . 2 . Treatments may include : a . Soil termiticides ( liquid barrier or bait systems ) b . Structural or spot treatments for active infestations c . Preventative applications for new or renovated a
- Status
- Closed
- Sector
- Education, Commercial
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about CSU - Termite Treatment and Bond Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . The Contractor shall apply treatment methods in accordance with industry best practices and product label requirements . 2 . Treatments may include : a . Soil termiticides ( liquid barrier or bait systems ) b . Structural or spot treatments for active infestations c . Preventative applications for new or renovated areas 3 . The Contractor shall issue and maintain a termite bond for each building treated , covering both retreatment and repair as specified below : a . Retreatment Bond : Covers the cost of future treatments if termites are detected . b . Repair Bond : Covers the cost of repairing termite - related structural damage . c . Bonds must be transferable to the University and renewable annually throughout the contract term . 4 . The Contractor shall notify the University sixty ( 60 ) days prior to any bond expiration or renewal . Required Treatment System – Sentricon ® 1 . Contractor shall furnish , install , monitor , and maintain the Sentricon ® Termite Colony Elimination System . All work shall be performed by a Certified Sentricon Specialist ™. 2 . Bait stations shall be installed every ten ( 10 ) linear feet around the full accessible perimeter of each structure , unless site obstructions or utilities require minor adjustments . Any deviation must be documented , justified , and approved in writing by CSU prior to installation . Emergency and Unscheduled Services 1 . The University may request emergency or unscheduled termite inspections or treatments as needed . 2 . The Contractor shall respond to : a . Emergency requests : within 4 hours b . Routine requests : within 2 business days 3 . Additional services beyond scheduled inspections must be documented and approved by the University ’ s Facilities Department prior to performance . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Education, Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Education tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- 23MISC11 Sign Language Interpreting Agency Services
- 21MISC11 Adaptive Equipment for Rock Creek School
- 23MISC15 Request for Qualifications of Photography Vendors
- 23CURR1 Music Equipment Supplies
- Bid 20C17 Waverley Elementary School New School Construction ReBid Contract Package 9D ResilientRubber Athletic Surfacing
- Living Shoreline Exhibit
- Communitywide Vulnerability Assessment Community and Stakeholder Engagement Workshops
