Cullompton Town Centre Relief Road (CTCRR) - Phase 5: Flood Compensation Area (FCA) works
Sector: Mass Transit • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
Devon County Council has procured a Work Order under its Minor Engineering Works Framework 2026-30 using the quotation procedure as set out in section 12 of the Framework Information for Lot 3. The work will involve the construction of a Flood Compensation area, consisting of the removal of 9,900m3 of material to specified levels within an agricultural field and reinstatement of the grass within
- Status
- Closed
- Sector
- Mass Transit, Rail, Bridge, Raw Materials, Automotive, Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Cullompton Town Centre Relief Road (CTCRR) - Phase 5: Flood Compensation Area (FCA) works
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Devon County Council has procured a Work Order under its Minor Engineering Works Framework 2026-30 using the quotation procedure as set out in section 12 of the Framework Information for Lot 3. The work will involve the construction of a Flood Compensation area, consisting of the removal of 9,900m3 of material to specified levels within an agricultural field and reinstatement of the grass within this area following construction. An access track along an already agreed alignment must be designed and constructed by the contractor to facilitate the work, with the track being removed and the area reinstated to previous condition follow completion of the scheme. The works are in close proximity to a main river and as such are to be completed in compliance with a Flood Risk Activities Permit (FRAP) which has been obtained by the client and is provided in the contract documents. The works are located in a privately owned field, most of which will remain open for grazing purposes, therefore as part of the work a cattle proof fence must be provided around the site and several gates so farming access can be retained through construction. There is a 3t weight limit on the railway bridge to the west of the site entrance, therefore construction vehicles must access the site from the west through narrow lanes before joining the A373. The work is expected to be completed as a single phase starting in May and completing by the middle of October. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Mass Transit, Rail, Bridge, Raw Materials, Automotive, Road |
Article published date | 2026-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Mass Transit tenders in United Kingdom
- Oxford Road Improvements and Oxford Parkway Master Plan
- Bus Services Framework
- Specialist Vehicles (1347)
- Drainage
- Bus shelter replacement, maintenance and refurbishment of bus shelters and associated public transport infrastructure service
- GMCA2118 Support for Appraisal of Good Growth Fund Applications
- Wales CEFA Lot 1 (Tunnels) & Lot 2 (Structures) - Direct Call off
- TPT519 - Asset Management / Maintenance of Station Information & Security Systems (SISS)
